High‐Velocity Household and Service Line Flushing Following LSL Replacement
暂无分享,去创建一个
[1] M. Raetz. Lead and Copper Corrosion Control in New Construction: Shock Chlorination, Flushing to Remove Debris & In-line Device Product Testing , 2010 .
[2] M. Edwards,et al. Profile sampling to characterize particulate lead risks in potable water. , 2014, Environmental science & technology.
[3] Marc Edwards,et al. LEAD (Pb) EXPOSURE THROUGH DRINKING WATER: LESSONS TO BE LEARNED FROM RECENT U.S. EXPERIENCE , 2009 .
[4] Gregory L. Pierson,et al. Pb in Tap Water Following Simulated Partial Lead Pipe Replacements , 2004 .
[5] Michèle Prévost,et al. Source and occurrence of particulate lead in tap water. , 2010, Water research.
[6] Pierre Kwan,et al. Contributions to drinking water lead from galvanized iron corrosion scales , 2011 .
[7] M. Edwards,et al. Lead (Pb) in Tap Water and in Blood: Implications for Lead Exposure in the United States , 2012 .
[8] Marc Edwards,et al. Lead Particles in Potable Water , 2007 .
[9] Laurie S. McNeill,et al. Importance of Pb and Cu Particulate Species for Corrosion Control , 2004 .
[10] M. Prévost,et al. Effect of flow rate and lead/copper pipe sequence on lead release from service lines. , 2012, Water research.
[11] A. E. Greenberg,et al. Standard Methods for the Examination of Water and Wastewater seventh edition , 2013 .