One machine scheduling problem with fuzzy processing times and a penalty for each job being late (the penalty is independent of the magnitude of the lateness) is considered. The optimal sequence is defined as one minimizing the expected value of the total penalty (the expected weighted number of jobs being late). Two special cases are discussed in which the problem can be reduced to well-known and easy to solve optimization problems.
[1] Horst A. Eiselt,et al. Single Machine Scheduling , 2004 .
[2] Marin Litoiu,et al. Real-time task scheduling with fuzzy deadlines and processing times , 2001, Fuzzy Sets Syst..
[3] Milan Vlach,et al. Single machine scheduling under fuzziness , 1998 .
[4] S. Chanas,et al. Single value simulation of fuzzy variables , 1988 .
[5] Maciej Hapke,et al. Scheduling under Fuzziness , 2000 .