Improving allowed outage time and surveillance test interval requirements: a study of their interactions using probabilistic methods
暂无分享,去创建一个
[1] P. K. Samanta,et al. Evaluation of risks associated with AOT and STI requirements at the ANO-1 nuclear power plant , 1988 .
[2] Sebastián Salvador Martorell Alsina. Análisis de la interacción entre los requisitos de tiempo máximo permitido de inoperabilidad (aot) e intervalo entre pruebas de vigilancia (sti) de componentes de sistemas de seguridad de centrales nucleares , 1992 .
[3] P. K. Samanta,et al. Technical Specification action statements requiring shutdown. A risk perspective with application to the RHR/SSW systems of a BWR , 1993 .
[4] Sebastian Martorell,et al. Quantitative evaluation of surveillance test intervals including test-caused risks , 1992 .
[5] Sebastian Martorell,et al. Risk analysis of surveillance requirements including their adverse effects , 1994 .