Determining optimal reorder intervals in capacitated production-distribution systems
暂无分享,去创建一个
[1] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[2] Arthur F. Veinott,et al. Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems , 1969, Oper. Res..
[3] Basil A. Kalymon. A Decomposition Algorithm for Arborescence Inventory Systems , 1972, Oper. Res..
[4] P. A. Jensen,et al. Scheduling in a Multistage Production System with Set-up and Inventory Costs , 1972 .
[5] Stephen F. Love. A Facilities in Series Inventory Model with Nested Schedules , 1972 .
[6] M. H. Wagner,et al. Dynamic Lot Size Models for Multi-Stage Assembly Systems , 1973 .
[7] Leroy B. Schwarz,et al. A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem , 1973 .
[8] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[9] Leroy B. Schwarz,et al. Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems , 1977 .
[10] J. Muckstadt,et al. Note---Comments on “Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems” , 1978 .
[11] Marc Lambrecht,et al. A facilities in series capacity constrained dynamic lot-size model , 1978 .
[12] Jack F. Williams. Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons , 1981 .
[13] J. Williams. Note-On the Optimality of Integer Lot Size Ratios in Economic Lot Size Determination in Multi-Stage Assembly Systems , 1982 .
[14] Joseph D. Blackburn,et al. Improved heuristics for multistage requirements planning systems , 1982 .
[15] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .
[16] W. Maxwell,et al. The Effect of Restricting Cycle Times in the Economic Lot Scheduling Problem , 1983 .
[17] William L. Maxwell,et al. A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems , 1983 .
[18] John E. Dennis,et al. Numerical methods for unconstrained optimization and nonlinear equations , 1983, Prentice Hall series in computational mathematics.
[19] Anthony J. Zahorik,et al. Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems , 1984 .
[20] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[21] William L. Maxwell,et al. Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..
[22] W. Maxwell,et al. The Joint Replenishment Problem with a Powers-of-Two Restriction , 1985 .
[23] R. Roundy. 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems , 1985 .
[24] R. Roundy. Efficient, Effective Lot-Sizing for Multi-Product Multi-Stage Production/Distribution Systems with Correlated Demands , 1985 .
[25] Robin O. Roundy,et al. Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .