An order expediting policy for continuous review systems with manufacturing lead-time
暂无分享,去创建一个
[1] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[2] Henk Tijms,et al. Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints , 1984 .
[3] E. Silver,et al. Safety stock reduction by order splitting , 1990 .
[4] Metin Çakanyildirim,et al. Random lead times and expedited orders in (Q, r) inventory systems , 1999, Eur. J. Oper. Res..
[5] Robert L. Bregman,et al. A heuristic procedure for solving the dynamic probabilistic project expediting problem , 2009, Eur. J. Oper. Res..
[6] Arthur F. Veinott,et al. Analysis of Inventory Systems , 1963 .
[7] W. C. Benton,et al. SOLE SOURCING VERSUS DUAL SOURCING UNDER STOCHASTIC DEMANDS AND LEAD TIMES , 1994 .
[8] Robert Handfield,et al. Production, Manufacturing and Logistics Ðq ; Rþ Inventory Policies in a Fuzzy Uncertain Supply Chain Environment , 2022 .
[9] Peter Kelle,et al. Stockout risk and order splitting , 2001 .
[10] Hon-Shiang Lau,et al. Optimal ordering policies with two suppliers when lead times and demands are all stochastic , 1993 .
[11] Y. Gerchak,et al. Continuous Review Inventory Models Where Random Lead Time Depends on Lot Size and Reserved Capacity , 2000 .
[12] Amy Hing-Ling Lau,et al. A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders , 2002 .
[13] Xiang Li,et al. On a multi-period supply chain system with supplementary order opportunity , 2011, Eur. J. Oper. Res..
[14] Chi Chiang,et al. Ordering policies for inventory systems with expediting , 2002, J. Oper. Res. Soc..
[15] Wen-Chyuan Chiang,et al. Reducing Inventory Costs by Order Splitting in the Sole Sourcing Environment , 1996 .
[16] Yu-Sheng Zheng. On properties of stochastic inventory systems , 1992 .
[17] Hayriye Ayhan,et al. Analytic Models for When and How to Expedite in Make-to-Order Systems , 2001 .
[18] Giovanni Miragliotta,et al. Complexity management and supply chain performance assessment. A field study and a conceptual framework , 2004 .
[19] R. Freund,et al. Tractable ( Q, R ) heuristic models for constrained service levels , 1997 .
[20] Evan L. Porteus,et al. Multistage Inventory Management with Expediting , 2000, Oper. Res..
[21] S. Y. Wu,et al. Stock Control with Two Suppliers and Normal Lead Times , 1981 .
[22] A. Krishnamoorthy,et al. (s, S) inventory with lead time-the N-policy , 1998 .
[23] S. G. Allen,et al. Letter to the Editor - An Ordering Policy for Stock Items when Delivery Can be Expedited , 1967, Oper. Res..
[24] de Ag Ton Kok,et al. Transportation mode selection with positive manufacturing lead time , 2005 .
[25] Chi Chiang,et al. Optimal replenishment for a periodic review inventory system with two supply modes , 2003, Eur. J. Oper. Res..