Development of Risk Uncertainty Factors from Historical NASA Projects

NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

[1]  Seth D. Guikema,et al.  Programmatic Risk Analysis for Critical Engineering Systems Under Tight Resource Constraints , 2003, Oper. Res..

[2]  Warren Connley,et al.  Integrated Risk Management Within NASA Programs/Projects , 2004 .

[3]  Jerry M. Sollinger,et al.  Impossible Certainty: Cost Risk Analysis for Air Force Systems , 2006 .

[4]  D.L. Emmons,et al.  Using Historical NASA Cost and Schedule Growth to Set Future Program and Project Reserve Guidelines , 2007, 2007 IEEE Aerospace Conference.

[5]  David T. Hulett,et al.  Integrated Cost-Schedule Risk Analysis , 2011 .

[6]  Robert Bitten,et al.  The effect of schedule constraints on the success of planetary missions , 2003 .

[7]  C. Ariel Pinto,et al.  Challenges to Sustainable Risk Management: Case Example in Information Network Security , 2006 .

[8]  Rahul Telang,et al.  Measuring the risk-based value of IT security solutions , 2004, IT Professional.

[9]  D. Nadler,et al.  Building better boards. , 2004, Harvard business review.

[10]  Lynne P. Cooper Assessing risk from a stakeholder perspective , 2003, 2003 IEEE Aerospace Conference Proceedings (Cat. No.03TH8652).

[11]  Samson Phan,et al.  An analogy-based method for estimating the costs of space-based instruments , 2003, 2003 IEEE Aerospace Conference Proceedings (Cat. No.03TH8652).

[12]  Glenn Butts,et al.  The Joint Confidence Level Paradox: A History of Denial , 2009 .

[13]  Vickie S. Parsons,et al.  Searching for “Unknown Unknowns” , 2007 .

[14]  Y. Haimes,et al.  Risk Management for Leontief‐Based Interdependent Systems , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[15]  Sumit Datta,et al.  Developing a Risk Management Matrix for Effective Project Planning—An Empirical Study , 2001 .

[16]  S. Grey Practical Risk Assessment for Project Management , 1995 .

[17]  Stan Kaplan,et al.  The Words of Risk Analysis , 1997 .