Applied Multi-Criteria Ideal Rehabilitation Model for Budget Allocation Across Road Infrastructure
暂无分享,去创建一个
[1] Ronald R. Yager,et al. Modeling prioritized multicriteria decision making , 2004, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[2] Wen-Chih Huang,et al. THE BUDGET ALLOCATION MODEL OF PUBLIC INFRASTRUCTURE PROJECTS , 2010 .
[3] Roman Słowiński,et al. Dominance-Based Rough Set Approach to Budget Allocation in Highway Maintenance Activities , 2011 .
[4] Min-Yuan Cheng,et al. Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studies , 2009 .
[5] Victor Fey,et al. Innovation on Demand by Victor Fey , 2005 .
[6] Yeng-Horng Perng,et al. Genetic algorithm-based decision support for the restoration budget allocation of historical buildings , 2007 .
[7] Roger L. Cross,et al. Budget Allocation Formulas: Magic or Illusion? , 2011 .
[8] Tarek Zayed,et al. Budget Allocation for Steel Bridge Paint Maintenance , 2004 .
[9] Ting-Ya Hsieh,et al. MULTISTAGE HEURISTIC APPROACH FOR SOLVING INFRASTRUCTURE INVESTMENT DECISION PROBLEMS , 1997 .
[10] G. S. Alʹtshuller,et al. And Suddenly the Inventor Appeared: TRIZ, the Theory of Inventive Problem Solving , 1996 .
[11] Victor Fey,et al. Innovation on demand , 2005 .
[12] Mohammadreza Yadollahi,et al. Development of the Analytical Hierarchy Process (AHP) method for rehabilitation project ranking before disasters , 2011 .
[14] Jesus M. de la Garza,et al. A Decision Support System for Road Maintenance Budget Allocation , 2000 .
[15] Victor Fey,et al. Innovation on Demand: Frontmatter , 2005 .
[16] Ellen Domb,et al. Simplified TRIZ: New Problem-Solving Applications for Engineers and Manufacturing Professionals , 2002 .
[17] Wen-Chih Huang,et al. Systematic budget allocation for transportation construction projects: a case in Taiwan , 2010 .
[18] Mahyar Shafii,et al. Multi-Criteria Decision Making under Uncertainty in Rainfall-Runoff Calibration: A Fuzzy Compromise Programming Approach Based on Alpha Level Sets , 2009 .
[19] Christopher Mackey,et al. Development of a prioritization methodology for maintaining Virginia's bridge infrastructure systems , 2009, 2009 Systems and Information Engineering Design Symposium.
[20] J Brown,et al. Management and control of cost and risk for tunneling and infrastructure projects , 2004 .