Feedback method of production ordering system in multi-stage production and inventory systems
暂无分享,去创建一个
[1] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[2] Herbert J. Vassian. Application of Discrete Variable Servo Theory to Inventory Control , 1955, Oper. Res..
[3] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .
[4] J. V. Aken. Aggregate planning in decentralized organizations , 1980 .
[5] Marc Lambrecht,et al. A facilities in series capacity constrained dynamic lot-size model , 1978 .
[6] B. D. Sivazlian,et al. Dynamic analysis of multi-echelon supply systems , 1978 .
[7] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[8] Kazuyoshi Ishii,et al. Some ways to increase flexibility in manufacturing systems , 1985 .
[9] Fred Hanssmann. Operations research in production and inventory control , 1962 .
[10] T. Tabe,et al. Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system , 1980 .
[11] John F. Magee,et al. Production planning and inventory control , 1958 .
[12] Kainer Seidel. Optimization of the availability of complex manufacturing systems—methods and examples , 1983 .
[13] D. Clay Whybark,et al. MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .