Estimating and validating harvesting system production through computer simulation

A Ground Based Harvesting System Simulation model (GB-SIM) has been developed to estimate stump-to-truck production rates and multiproduct yields for conventional ground-based timber harvesting systems in Appalachian hardwood stands. Simulation results reflect inputs that define harvest site and timber stand attributes, wood utilization options, and key attributes of the harvesting operation. Statistical validation of GB-SIM was conducted with harvesting production data collected from 16 harvest units and 2 logging operations, including partial cuts and clearcuts in Appalachian hardwood stands. The mean error in estimated production rates was 14.1 ft.3/ hour, or 2.6 percent of the observed rates. For 10 of the 16 units, this error was less than 10 percent of the observed production rate. Nonparametric tests conducted with five replications of each simulated harvest did not find a statistically significant difference between the distributions of actual and simulated production rates. These validation results indicate that GB-SIM can be used to estimate harvesting system production rates and product yields; information required to conduct economic analysis of wood utilization and forest management alternatives. Simulation results are also presented that contrast two different logging crews and compare production rates from eight unique wood utilization options.

[1]  Chris B. LeDoux Stump-to-mill timber production cost equations for cable logging eastern hardwoods , 1985 .

[2]  Leonard R. Johnson,et al.  Reliable results from stochastic simulation models , 1973 .

[3]  Chris B. LeDoux,et al.  Productivity and cost estimators for conventional ground-based skidding on steep terrain using preplanned skid roads , 1991 .

[4]  Daniel V. Goulet,et al.  Analysis of five forest harvesting simulation models. Part II. Paths, pitfalls, and other considerations. , 1980 .

[5]  F. Cubbage,et al.  Economies of Forest Tract Size in Southern Pine Harvesting , 1982 .

[6]  Robert D. Bell Influences of varying stand harvest methods on timber harvesting costs in southwestern Virginia hardwoods , 1989 .

[7]  Gary W. Miller,et al.  Felling and skidding costs associated with thinning a commercial Appalachian hardwood stand in northern West Virginia , 1986 .

[8]  M. P. McCollum,et al.  An Equation for Predicting Harvesting Costs on Second-Growth Southern Yellow Pine Sites in the Midsouth , 1983 .

[9]  D. V. Goulet,et al.  State-of-the-art report: tree-to-mill forest harvesting simulation models: where are we , 1979 .

[10]  Chris B. LeDoux,et al.  Felling and skidding cost estimates for thinnings to reduce gypsy moth impacts , 1991 .

[11]  W. B. Stuart,et al.  Simulation of the impact of future market prices on the management of loblolly pine plantations , 1985 .

[12]  M. E. Dale,et al.  Butt log quality of trees in Pennsylvania oak stands , 1985 .

[13]  W. B. Stuart,et al.  Economics of modifying harvesting systems to recover energy wood , 1981 .

[14]  Steven A. Sinclair,et al.  Profitability of Various Timber Harvesting Systems as Affected by Product Sorting and Timber Stand Parameters , 1986 .

[15]  J. D. Johannes,et al.  Systems Simulation: The Art and Science , 1975, IEEE Transactions on Systems, Man, and Cybernetics.

[16]  Chris B. LeDoux MANAGE: A computer program to estimate costs and benefits associated with eastern hardwood management , 1986 .

[17]  W. D. Greene,et al.  Microcomputer-Based Software for Analyzing Harvesting Systems , 1988 .

[18]  Daniel A. Yaussy,et al.  Predicting volumes and numbers of logs by grade from hardwood cruise data , 1988 .

[19]  A. Martin,et al.  Taper and volume equations for selected Appalachian hardwood species , 1981 .

[20]  Gary W. Miller,et al.  Costs, yields, and revenues associated with thinning and clearcutting 60-year-old cherry-maple stands , 1986 .