A Note on Exact Moment Computation for Normal Lead Times in the Two-Supplier Case
暂无分享,去创建一个
[1] J. Keith Ord,et al. Multiple sourcing: The determination of lead times , 1991, Oper. Res. Lett..
[2] E. Silver,et al. Safety stock reduction by order splitting , 1990 .
[3] Shu S. Liao,et al. An Analysis of Risk and Return in the Defense Market: Its Impact on Weapon System Competition , 1986 .
[4] S. Y. Wu,et al. Stock Control with Two Suppliers and Normal Lead Times , 1981 .
[5] Ranga V. Ramasesh,et al. Sole Versus Dual Sourcing in Stochastic Lead-Time s, Q Inventory Models , 1991 .
[6] D. Sculli,et al. Analysis of a Continuous Review Stock-control Model with Multiple Suppliers , 1990 .
[7] I. Horowitz. ON TWO‐SOURCE FACTOR PURCHASING , 1986 .