A Hybrid Methodology for Validation of Optimization Solutions Effects on Manufacturing Sustainability with Time Study and Simulation Approach for SMEs
暂无分享,去创建一个
Aydin Azizi | Majid Hashemipour | Poorya Ghafoorpoor Yazdi | A. Azizi | Poorya Ghafoorpoor Yazdi | M. Hashemipour
[1] Abdul Talib Bon,et al. Time motion study in determination of time standard in manpower process , 2010 .
[2] Andrea Matta,et al. Mathematical programming models for joint simulation–optimization applied to closed queueing networks , 2015, Ann. Oper. Res..
[3] A. Azizi,et al. An Empirical Investigation of the Relationship between Overall Equipment Efficiency (OEE) and Manufacturing Sustainability in Industry 4.0 with Time Study Approach , 2018, Sustainability.
[4] Samuel H. Huang,et al. Manufacturing productivity improvement using effectiveness metrics and simulation analysis , 2003 .
[5] Jitendra Kumar,et al. MAINTENANCE PERFORMANCE METRICS FOR MANUFACTURING INDUSTRY , 2013 .
[6] Behzad Esmaeilian,et al. The evolution and future of manufacturing: A review , 2016 .
[7] Henri Pierreval,et al. Regression metamodeling for the design of automated manufacturing system composed of parallel machines sharing a material handling resource , 2004 .
[8] Francesco Longo,et al. Effective design of an assembly line using modelling and simulation , 2009, J. Simulation.
[9] Bernardo Almada-Lobo,et al. Hybrid simulation-optimization methods: A taxonomy and discussion , 2014, Simul. Model. Pract. Theory.
[10] Uthiyakumar Murugaiah,et al. The use of 5-WHYs technique to eliminate OEE’s speed loss in a manufacturing firm , 2015 .
[11] Fiona Fui-Hoon Nah,et al. Critical factors for successful implementation of enterprise systems , 2001, Bus. Process. Manag. J..
[12] Aydin Azizi,et al. Interactive design of storage unit utilizing virtual reality and ergonomic framework for production optimization in manufacturing industry , 2018, International Journal on Interactive Design and Manufacturing (IJIDeM).
[13] Henry Y. K. Lau,et al. An agent-based dynamic routing strategy for automated material handling systems , 2008, Int. J. Comput. Integr. Manuf..
[14] Günther Seliger,et al. Design and Verification of an Innovative Handling System for Electrodes in Manufacturing Lithium-ion Battery Cells , 2016 .
[15] Jeffrey S. Smith,et al. Simulation for manufacturing system design and operation: Literature review and analysis , 2014 .
[16] Sotiris Makris,et al. The role of simulation in digital manufacturing: applications and outlook , 2015, Int. J. Comput. Integr. Manuf..
[17] Michael C. Fu,et al. Feature Article: Optimization for simulation: Theory vs. Practice , 2002, INFORMS J. Comput..
[18] Sotiris Makris,et al. Automotive assembly technologies review: challenges and outlook for a flexible and adaptive approach , 2010 .
[19] Andreas Syska. Methods-Time-Measurement (MTM) , 2006 .
[20] Aydin Azizi,et al. Design and fabrication of intelligent material handling system in modern manufacturing with industry 4.0 approaches , 2015, ICRA 2015.
[21] Des Tedford,et al. Risk determinants of small and medium-sized manufacturing enterprises (SMEs) - an exploratory study in New Zealand , 2012 .
[22] Angel A. Juan,et al. A review of simheuristics: Extending metaheuristics to deal with stochastic combinatorial optimization problems , 2015 .
[23] Henry C. W. Lau,et al. Integration of expert system with analytic hierarchy process for the design of material handling equipment selection system , 2001 .
[24] Juhaini Jabar,et al. CONCEPTUAL STUDY ON SUSTAINABLE MANUFACTURING PRACTICES AND FIRM PERFORMANCE , 2014 .
[25] Ilkka Kauranen,et al. Open innovation in SMEs: a systematic literature review , 2016 .
[26] José Barbosa,et al. Dynamic self-organization in holonic multi-agent manufacturing systems: The ADACOR evolution , 2015, Comput. Ind..
[27] Dong Zhou,et al. A maintenance time estimation method based on virtual simulation and improved modular arrangement of predetermined time standards , 2020 .
[29] M. Elnekave *,et al. Rapid video-based analysis system for advanced work measurement , 2006 .
[30] Peter Muchiri,et al. Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion , 2008 .
[31] 中嶋 清一,et al. Introduction to TPM : total productive maintenance , 1988 .
[32] Saeid Nahavandi,et al. Status-based Routing in Baggage Handling Systems: Searching Verses Learning , 2010, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[33] Weiming Shen,et al. Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing , 2000 .
[34] Maria Lai-Ling Lam. Challenges of sustainable environmental programs of foreign multinational enterprises in China , 2011 .
[35] S. C. Prasanna,et al. Lean Six Sigma Approach to Improve Overall Equipment Effectiveness Performance: A Case Study in the Indian Small Manufacturing Firm , 2016 .
[36] R. H. Smith. Optimization for Simulation : Theory vs . Practice , 2002 .
[37] Andrea Matta,et al. A time-based decomposition algorithm for fast simulation with mathematical programming models , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).
[38] Søren Jeppesen,et al. SMEs and CSR in Developing Countries , 2017 .
[39] Richard M. Murray,et al. Information flow and cooperative control of vehicle formations , 2004, IEEE Transactions on Automatic Control.
[40] T.J. Schriber,et al. Inside discrete-event simulation software: How it works and why it matters , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).
[41] Anthony D. May,et al. Urban Transport and Sustainability: The Key Challenges , 2013 .
[42] P. Jonsson,et al. Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE , 1999 .
[43] Raffaele Iannone,et al. Managing OEE to Optimize Factory Performance , 2013 .
[44] T. Minshall,et al. Open innovation: a new classification and its impact on firm performance in innovative SMEs , 2015 .
[45] Wilfried Sihn,et al. Methodical approach to increase productivity and reduce lead time in assembly and production-logistic processes , 2011 .