Improving Value Generation in the Design Process of Industrial Projects Using CAVT
暂无分享,去创建一个
[1] Mike Williams,et al. Graphical Simulation for Project Planning: 4D-Planner T M , 1996 .
[2] Luis F. Alarcón,et al. Achieving Lean Design Process: Improvement Methodology , 2002 .
[3] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[4] Robert Fox,et al. 4D planning and scheduling (4D-ps): grounding construction it research in industry practice , 2001 .
[5] Glenn Ballard,et al. What Kind of Production Is Construction , 1998 .
[6] L Rischmoller,et al. 4D-PS: Putting an IT new work process into effect , 2002 .
[7] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[8] Martin Fischer,et al. THE SCOPE AND ROLE OF INFORMATION TECHNOLOGY IN CONSTRUCTION , 2004 .
[9] R. Yin. Case Study Research: Design and Methods , 1984 .
[10] David Heesom,et al. Trends of 4D CAD applications for construction planning , 2004 .
[11] A. R. Crathorne,et al. Economic Control of Quality of Manufactured Product. , 1933 .
[12] Lauri Koskela,et al. Information technology in construction: how to realise the benefits? , 2003 .