This paper was selected for presentation by an IADC/SPE Program Committee following review of information contained in an abstract submitted by the author(s). Contents of the paper, as presented, have not been reviewed by the International Association of Drilling Contractors or the Society of Petroleum Engineers and are subject to correction by the author(s). The material, as presented, does not necessarily reflect any position of the IADC or SPE, their officers, or members. Papers presented at the IADC/SPE meetings are subject to publication review by Editorial Committees of the IADC and SPE. Electronic reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The
[1]
Arild Saasen,et al.
The Influence of Drilling Conditions on Annular Pressure Losses
,
1992
.
[2]
J. J. Azar,et al.
Effect of Drillpipe Rotation on Hole Cleaning During Directional-Well Drilling
,
1999
.
[3]
L. Rayleigh.
On the Stability, or Instability, of certain Fluid Motions
,
1879
.
[4]
A. Saasen.
Hole cleaning during deviated drilling : The effects of pump rate and rheology
,
1998
.
[5]
J. J. Azar,et al.
The effect of drillpipe rotation on hole cleaning during directional well drilling
,
1997
.
[6]
Arild Saasen,et al.
Application of Ilmenite as Weight Material in Water Based and Oil Based Drilling Fluids
,
2001
.