A STOCHASTIC MODEL TO DETERMINE THE ELEMENTS OF PRODUCTION CYCLE TIME IN ENTERPRISE
暂无分享,去创建一个
Zvonko Sajfert | Sanja Stanisavljev | Milivoj Klarin | Miroslav Radoji | Vesna Spasojevic | Ć Brki | Milan Nikoli | Bojan Jovanovski
[1] M Klarin,et al. A method to assess capacity utilization in short cycle functional layouts , 2010 .
[2] Harold Bright Maynard,et al. Industrial engineering handbook , 1956 .
[3] M. Krisper,et al. Optimal algorithm for minimizing production cycle time of a printed circuit board assembly line , 2004 .
[4] Giancarlo Barbiroli,et al. A method for evaluating the overall technical and economic performance of environmental innovations in production cycles , 2003 .
[5] Tzu-Hsien Lee. Optimal production run length and maintenance schedule for a deteriorating production system , 2008 .
[6] Kuo-Lung Hou,et al. The optimal production cycle time in an integrated production-inventory model for decaying raw materials , 2009 .
[7] Won Young Yun,et al. Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle , 2005 .
[8] Joseph J. Moder. Selection of Work Sampling Observation Times: Part I—Stratified Sampling , 1980 .
[9] Mihajlo Pupin,et al. DEVELOPMENT OF A STOHASTIC MODEL FOR DETERMINING THE ELEMENTS OF PRODUCTION CYCLE TIME AND THEIR OPTIMIZATION FOR SERIAL PRODUCTION IN METAL PROCESSING INDUSTY AND RECYCLING PROCESSES , 2011 .
[10] Rakesh Nagi,et al. Cycle time reduction by improved MRP-based production planning , 2000 .
[11] M. Elnekave *,et al. Rapid video-based analysis system for advanced work measurement , 2006 .
[12] Milivoj Klarin,et al. The shift level of the utilization of capacity as the stochastic variable in work sampling , 2000 .