Ship assignment with hub and spoke constraints
暂无分享,去创建一个
[1] Xie Xinlian,et al. A dynamic model and algorithm for fleet planning , 1992 .
[2] Jacques Desrosiers,et al. Time Constrained Routing and Scheduling , 1992 .
[3] G. Nemhauser,et al. Integer Programming , 2020 .
[4] Ignacy Chrzanowski,et al. An introduction to shipping economics , 1985 .
[5] Kjetil Fagerholt,et al. Optimal fleet design in a ship routing problem , 1999 .
[6] Patrick M. Alderton,et al. Port Management and Operations , 1999 .
[7] Ross Robinson,et al. Asian hub/feeder nets: the dynamics of restructuring , 1998 .
[8] Jacques Desrosiers,et al. Chapter 2 Time constrained routing and scheduling , 1995 .
[9] Kjetil Fagerholt. Evaluating the trade-off between the level of customer service and transportation costs in a ship scheduling problem , 2000 .
[10] Anastassios N. Perakis,et al. Fleet deployment optimization for liner shipping Part 1. Background, problem formulation and solution approaches , 1991 .
[11] B. J. Powell,et al. Fleet deployment optimization for liner shipping: an integer programming model , 1997 .
[12] Anastassios N. Perakis,et al. Fleet deployment optimization for liner shipping Part 2. Implementation and results , 1991 .
[13] Yehuda Hayuth,et al. Intermodality : concept and practice : structural changes in the ocean freight transport industry , 1987 .
[14] Anastassios N. Perakis,et al. OPTIMAL LINER FLEET ROUTEING STRATEGIES. , 1996 .