Project scheduling with alternative technologies: Incorporating varying activity duration variability
暂无分享,去创建一个
[1] Chris Chapman,et al. Transforming project risk management into project uncertainty management , 2003 .
[2] I Ben-David,et al. An integrated approach for risk response development in project planning , 2001, J. Oper. Res. Soc..
[3] Rong Li,et al. Residual-life distributions from component degradation signals: A Bayesian approach , 2005 .
[4] D. Cox. Regression Models and Life-Tables , 1972 .
[5] Antoine Grall,et al. MAINTENANCE POLICY FOR A CONTINUOUSLY MONITORED DETERIORATING SYSTEM , 2003 .
[6] Viliam Makis,et al. Optimal Replacement In The Proportional Hazards Model , 1992 .
[7] M. Weitzman. Optimal search for the best alternative , 1978 .
[8] Franz Josef Radermacher,et al. Preselective strategies for the optimization of stochastic project networks under resource constraints , 1983, Networks.
[9] Joseph G. Szmerekovsky,et al. Scheduling projects with stochastic activity duration to maximize expected net present value , 2009, Eur. J. Oper. Res..
[10] M. Nikulin,et al. Estimation in Degradation Models with Explanatory Variables , 2001, Lifetime data analysis.
[11] M. Crowder,et al. Covariates and Random Effects in a Gamma Process Model with Application to Degradation and Failure , 2004, Lifetime data analysis.
[12] Daniel Granot,et al. Optimal Sequencing and Resource Allocation in Research and Development Projects , 1991 .
[13] Mitra Fouladirad,et al. Condition-based inspection/replacement policies for non-monotone deteriorating systems with environmental covariates , 2010, Reliab. Eng. Syst. Saf..
[14] Ely Dahan,et al. Reducing Technical Uncertainty in Product and Process Reducing Technical Uncertainty in Product and Process Development Through Parallel Design of Prototypes Development Through Parallel Design of Prototypes , 1998 .
[15] William J. Abernathy,et al. Parallel Strategies in Development Projects , 1969 .
[16] Ely Dahan,et al. Reducing Technical Uncertainty in Product and Process Development Through Parallel Design of Prototypes , 1999 .
[17] Tonguç Ünlüyurt,et al. Sequential testing of complex systems: a review , 2004, Discret. Appl. Math..
[18] Meir J. Rosenblatt,et al. Activity Delay in Stochastic Project Networks , 1997, Oper. Res..
[19] Suk Joo Bae,et al. Degradation models and implied lifetime distributions , 2007, Reliab. Eng. Syst. Saf..
[20] Ming Ding,et al. Structuring the New Product Development Pipeline , 2002, Manag. Sci..
[21] Vipul Jain,et al. Resource-Constrained Scheduling of Tests in New Product Development , 1999 .
[22] Antoine Grall,et al. Continuous-time predictive-maintenance scheduling for a deteriorating system , 2002, IEEE Trans. Reliab..
[23] Roel Leus,et al. R&D project scheduling when activities may fail , 2007 .
[24] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[25] Robert P. Smith,et al. A model-based method for organizing tasks in product development , 1994 .
[26] Christoph H. Loch,et al. Parallel and Sequential Testing of Design Alternatives , 2001, Manag. Sci..
[27] R. Nelson. Uncertainty, Learning, and the Economics of Parallel Research and Development Efforts , 1961 .
[28] Hongzhou Wang,et al. A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..
[29] Zehua Chen,et al. Lifetime distribution based degradation analysis , 2005, IEEE Transactions on Reliability.
[30] Reza H. Ahmadi,et al. Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..
[31] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[32] Ignacio E. Grossmann,et al. Optimization Models for the Scheduling of Testing Tasks in New Product Development , 1996 .
[33] Jan M. van Noortwijk,et al. A survey of the application of gamma processes in maintenance , 2009, Reliab. Eng. Syst. Saf..
[34] Yigal Gerchak,et al. On the allocation of uncertainty-reduction effort to minimize total variability , 2000 .
[35] Marc Lambrecht,et al. Scheduling Markovian PERT networks to maximize the net present value , 2010, Oper. Res. Lett..
[36] Stefano Benati,et al. An Optimization Model for Stochastic Project Networks with Cash Flows , 2006, Comput. Manag. Sci..