Making client values explicit in value management workshops

Value management is a project‐focused process that makes explicit and appraises the functional benefits of a product, process or service consistent with a value system determined by the client. The value system of the client necessarily requires a method for value setting using harder performance variables than the commonly described facets of time, cost and quality. Current value theory is critically appraised in the context of current value management practice. The research proposition is that the constituent parts of time, cost and quality can be made overt enabling a client to express satisfaction in terms of a finite number of variables enabling the explicit statement of client value within a value management workshop. An action research study into the discovery of the component parts of the client's value system at the early stages of construction projects concludes that the variables are the nine non‐correlated, high order, discretionary performance variables of capital expenditure, operational expenditure, time, esteem, environment, exchange, politics/community, flexibility and comfort.

[1]  Richard J. Park,et al.  Value Engineering: A Plan for Invention , 1998 .

[2]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[3]  E. Ziegel Juran's Quality Control Handbook , 1988 .

[4]  M. Zimmerman,et al.  The nature of intrinsic value , 2001 .

[5]  John Kelly,et al.  Value Management of Construction Projects: Kelly/Value , 2008 .

[6]  L. W. Crum,et al.  Value engineering : the organised search for value , 1971 .

[7]  H. Osborne,et al.  Definition of Value , 1931, Philosophy.

[8]  Lawrence D. Miles,et al.  Techniques Of Value Analysis And Engineering , 1961 .

[9]  L. Harris,et al.  Value analysis. , 1983, Hospital gift shop management.

[10]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[11]  M. Larry Shillito,et al.  Value: Its Measurement, Design, and Management , 1992 .

[12]  R. Audi The Cambridge Dictionary of Philosophy , 1995 .

[13]  John Bicheno,et al.  The Lean Toolbox , 1999 .

[14]  Larry W. Zimmerman,et al.  Value Engineering : A Practical Approach For Owners, Designers And Contractors , 1988 .

[15]  Principia Ethica , 1922, Nature.

[16]  Robert G. Hershberger,et al.  Architectural Programming and Predesign Manager , 1999 .

[17]  Arthur E. Mudge Value engineering: A systematic approach , 1971 .

[18]  James Jerome O'Brien Value analysis in design and construction , 1976 .

[19]  Scott Fernie,et al.  The Value Management Benchmark: a Good Practice Framework for Clients and Practitioners , 1998 .

[20]  Mei-yung Leung,et al.  Developing a soft value management model , 2002 .

[21]  Stuart D. Green A participative research strategy for propagating soft methodologies in value management practice , 1999 .

[22]  Alphonse J. Dell'Isola,et al.  Value engineering : practical applications --for design, construction, maintenance & operations , 1997 .

[23]  Scott Fernie,et al.  The Value Management Benchmark: Research Results of an International Benchmarking Study , 1998 .

[24]  Robert Brodie INSTITUTION OF CIVIL ENGINEERS , 1942 .

[25]  Donna P. Duerk,et al.  Architectural Programming: Information Management for Design , 1993 .

[26]  William Peña,et al.  Problem Seeking: An Architectural Programming Primer , 1977 .

[27]  Vitruvius Pollio,et al.  Ten Books on Architecture , 2019 .

[28]  Mei-yung Leung,et al.  Value management in construction projects , 2001 .

[29]  G. Susman,et al.  An Assessment of the Scientific Merits of Action Research. , 1978 .

[30]  Kerry London,et al.  Construction Management: New Directions , 2002 .