Fuzzy palmer Scheduling for Flow Shops with More than Two Machines
暂无分享,去创建一个
[1] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[2] Stefan Chanas,et al. Integer flows in network with fuzzy capacity constraints , 1986, Networks.
[3] Tzung-Pei Hong,et al. Fuzzy scheduling on two-machine flow shop , 1998, J. Intell. Fuzzy Syst..
[4] S. H. Nasution. Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..
[5] C. Klein. Fuzzy shortest paths , 1991 .
[6] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[7] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[8] Mitsuo Gen,et al. An efficient approach for large scale project planning based on fuzzy Delphi method , 1995, Fuzzy Sets Syst..
[9] Tzung-Pei Hong,et al. LPT scheduling for fuzzy tasks , 1998, Fuzzy Sets Syst..
[10] Igor Gazdik. Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.
[11] S. Chanas,et al. Real-valued flows in a network with fuzzy arc capacities , 1984 .
[12] E. Lee,et al. Job sequencing with fuzzy processing times , 1990 .
[13] Hiroaki Ishii,et al. One machine scheduling problem with fuzzy duedates , 1994 .
[14] E. Lee,et al. Project network analysis with fuzzy activity times , 1988 .