Phased Startup Initiative Phase 3 Test Procedure (OCRWM)
暂无分享,去创建一个
The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation.