Stepwise Methods in Optimal Control Problems

We introduce a new method, stepwise method for solving optimal control problems. Our first motivation for new approach emanate from limitations on continuous time control functions in PMP. Practically in most of the real world models, we are not able to change control value for every time such as in drug dose calculation or in resourse allocation problems. But it is practical to change control value in some time section that lead to stepwise control function. We study some examples via classical Pontryagin Maximum Principle(PMP) and via stepwise method. The new method has some other advantages in comparison with PMP method in models with complicated cost function or systems. In real world applications, the new method has a high performance in implementation.