Top Down 공사의 선기둥 수직도 계측

The purpose of this study is to measure the straightness of prefounded columns during underground construction stages. There are several causes of an error of prefounded column: ① columns connected by welding or bolting, ② by placement of concrete and aggregates around columns, ③ movement during construction, and ④ load applied during construction. The error of column straightness is different for each column, and the tilting of columns is shown in one or two directions between floors. The additional loads caused by the error of straightness may give damage to buildings. This paper presents the measurement results of column straightness, and thus providing a basis for further analysis.