대단면 터널의 선지보네일 보강에 따른 아칭특성 연구

In this study, it was studied on arching characteristics of a grand section tunnel with pre-steel-rib nail reinforcement. In this study, we examine the adaptation of tunnel plan and the case which is based on the strengthening method for preexistence tunnel and other pre-steel-rib nail while the upper part of cover depth is low or soil condition is bad. When the pre-steel-rib nail as new technology and method reinforces the foundation placed of grand section tunnel, it is much better in strengthening effect, safety and effectiveness than the conventional one. After investigation about the plan pre-steel-rib nail method, construction case and calibration data, it was confirmed and examined about the upper part of tunnel for strengthening the pre-steel-rib nail thereby arching characteristics of grand section tunnel using MIDAS/GTS finite element program. Moreover we present the method that could upgrade the accurate installation interval and adaptation method for strengthening effect to adapt the pre-steel-rib nail method in a foundation placed over a tunnel.