Scheduling dynamic block assembly in shipbuilding through hybrid simulation and spatial optimisation
暂无分享,去创建一个
[1] Changkyu Park,et al. A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project , 2002 .
[2] K. K. Cho,et al. A Spatial Scheduling System for Block Painting Process in Shipbuilding , 2001 .
[3] Richard A. Wysk,et al. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing , 1989 .
[4] Jeffrey S. Smith,et al. Survey on the use of simulation for manufacturing system design and operation , 2003 .
[5] C. Ryu,et al. Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding , 2008, Int. J. Comput. Integr. Manuf..
[6] M. D. Byrne,et al. Production planning using a hybrid simulation – analytical approach , 1999 .
[7] Kyungsik Lee,et al. Modeling and solving the spatial block scheduling problem in a shipbuilding company , 1996 .
[8] Seok Jin Lim,et al. Hybrid approach to production scheduling using genetic algorithm and simulation , 2006 .
[9] Taho Yang,et al. An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study , 2009, Comput. Ind. Eng..
[10] Zhibin Jiang,et al. Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology , 2009 .
[11] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[12] Andrea Lodi,et al. Two-dimensional packing problems: A survey , 2002, Eur. J. Oper. Res..
[13] Jon Gribskov. A Group Technology Approach to Master Scheduling of Shipbuilding Projects (The National Shipbuilding Research Program) , 1988 .
[14] Jae Kyu Lee,et al. A spatial scheduling system and its application to shipbuilding: DAS-CURVE , 1996 .
[15] W. David Kelton,et al. Chapter 7 Implementing Representations of Uncertainty , 2006, Simulation.
[16] Richard A. Wysk,et al. Simulation-based planning and control: From shop floor to top floor , 2007 .
[17] Yeong-Dae Kim,et al. Simulation-based real-time scheduling in a flexible manufacturing system , 1993 .
[18] Duck Young Yoon,et al. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm , 2005, INDIN '05. 2005 3rd IEEE International Conference on Industrial Informatics, 2005..
[19] Ihsan Sabuncuoglu,et al. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop , 2001 .
[20] S. K. Banerjee,et al. Group technology in the shipbuilding industry , 1974 .
[21] Jae Kyu Lee,et al. Developing scheduling systems for Daewoo Shipbuilding: DAS project , 1997 .
[22] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[23] Bernard W. Taylor,et al. A comparative analysis of the COVERT job sequencing rule using various shop performance measures , 1987 .
[24] Tomás Lozano-Pérez,et al. Spatial Planning: A Configuration Space Approach , 1983, IEEE Transactions on Computers.
[25] Bo Li,et al. A dynamic scheduling method for spatial layout planning , 2005, 2005 International Conference on Machine Learning and Cybernetics.
[26] Cheolho Ryu,et al. Heuristic and metaheuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution , 2008 .
[27] Ihsan Sabuncuoglu,et al. A STUDY OF SCHEDULING RULES OF FLEXIBLE MANUFACTURING SYSTEMS : A SIMULATION APPROACH , 1998 .
[28] H. Spickndl,et al. Scheduling Methods For Ship Build Strategy Development : Literature Search and Research Report for the Midterm Sealift Generic Build Strategy Task , 2005 .
[29] T. Yang *,et al. Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case study , 2004 .
[30] Zhuo Liu,et al. Aggregate production planning for shipbuilding with variation-inventory trade-offs , 2011 .
[31] Qingcheng Zeng,et al. Integrating simulation and optimization to schedule loading operations in container terminals , 2009, Comput. Oper. Res..
[32] Julia A. Bennell,et al. The geometry of nesting problems: A tutorial , 2008, Eur. J. Oper. Res..
[33] Yeong-Dae Kim,et al. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules , 1998 .
[34] P. Raj,et al. Analytical and heuristic approaches for solving the spatial scheduling problem , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.
[35] Mostafa Zandieh,et al. Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop , 2009, J. Intell. Manuf..
[36] Vidyaranya B. Gargeya,et al. Scheduling in the dynamic job shop under auxiliary resource constraints: A simulation study , 1999 .
[37] Jeffrey S. Smith,et al. Simulation-based shop floor control , 2002 .
[38] J. E. Rooda,et al. Modeling and Analysis of Manufacturing Systems , 2007, Handbook of Dynamic System Modeling.
[39] Masaaki Muraki,et al. An extended dispatching rule approach in an on-line scheduling framework for batch process management , 1996 .
[40] Lee Dong-Ho,et al. A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .
[41] J. Banks,et al. Discrete-Event System Simulation , 1995 .
[42] Yeong-Dae Kim,et al. Hierarchical Production Planning for Semiconductor Wafer Fabrication Based on Linear Programming and Discrete-Event Simulation , 2010, IEEE Transactions on Automation Science and Engineering.
[43] Herbert Freeman,et al. Determining the minimum-area encasing rectangle for an arbitrary closed curve , 1975, CACM.