2 - Stage Optimal Design and Analysis for Disassembly System with Environmental and Economic Parts Selection Using the Recyclability Evaluation Method

Promotion of a closed-loop supply chain requires disassembly systems that recycle end-of-life (EOL) assembled products. To operate the recycling disassembly system, parts selection is environmentally and economically carried out with non-destructive or destructive disassembly, and the recycling rate of the whole EOL product is determined. As the number of disassembled parts increases, the recycling rate basically increases. However, the labor cost also increases and brings lower profit, which is the difference between the recovered material prices and the disassembly costs. On the other hand, since the precedence relationships among disassembly tasks of the product also change with the parts selections, it is also required to optimize allocation of the tasks in designing a disassembly line. In addition, because information is required for such a design, the recycling rate, profit of each part and disassembly task times take precedence among the disassembly tasks. However, it is difficult to obtain that information in advance before collecting the actual EOL product. This study proposes and analyzes an optimal disassembly system design using integer programming with the environmental and economic parts selection (Igarashi et al., 2013), which harmonizes the recycling rate and profit using recyclability evaluation method (REM) developed by Hitachi, Ltd. The first stage involves optimization of environmental and economic parts selection with integer programming with e constraint, and the second stage involves optimization of the line balancing with integer programming in terms of minimizing the number of stations. The first and second stages are generally and mathematically formulized, and the relationships between them are analyzed in the cases of cell phones, computers and cleaners.

[1]  Rajeev Jain,et al.  A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem , 2013 .

[2]  Ayyuce Aydemir-Karadag,et al.  Multi-objective optimization of stochastic disassembly line balancing with station paralleling , 2013, Comput. Ind. Eng..

[3]  Surendra M. Gupta,et al.  2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.

[4]  Masayuki Matsui,et al.  2-Stage Design Method for Assembly Line Systems with Stoppers , 2001 .

[5]  Shu-Hao Chang,et al.  Analyzing Offshore Wind Power Patent Portfolios by Using Data Clustering , 2014 .

[6]  Toshijiro Ohashi,et al.  Recyclability Evaluation Method , 2002 .

[7]  T. Yamada,et al.  Information Sharing and Utilization for Environmental Loads in Disassembly System Design with PLM , 2012 .

[8]  Alfred J.D. Lambert,et al.  Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .

[9]  Masato Inoue,et al.  Disassembly System Design with Environmental and Economic Parts Selection using the Recyclability Evaluation Method , 2013 .

[10]  Tsai C. Kuo,et al.  Waste electronics and electrical equipment disassembly and recycling using Petri net analysis , 2010, The 40th International Conference on Computers & Indutrial Engineering.

[11]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[12]  Muhammad Azam,et al.  New attributes and variables control charts under repetitive sampling , 2014 .

[13]  Surendra M. Gupta,et al.  Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem , 2013, Expert Syst. Appl..

[14]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[15]  Ken-ichi Tanaka,et al.  A Multiobjective Model for Locating Drop-off Boxes for Collecting Used Products , 2013 .

[16]  山本 典明,et al.  リサイクル性評価法の家電製品への適用事例 : プラズマテレビのリサイクル率, リサイクルコストの評価 , 2008 .