Relationships between Batch Sizes, Sequencing and Lead-times
暂无分享,去创建一个
[1] Larry P. Ritzman,et al. Planned Lead Times in Multistage Systems , 1998 .
[2] Mikell P. Groover,et al. Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .
[3] Roelof Kuik,et al. Lead-time variability in a homogeneous queueing model of batching , 1999 .
[4] J. Somlo,et al. Optimal Lot Streaming for FMS Scheduling of Flow-Shop Systems , 2008, 2008 International Conference on Intelligent Engineering Systems.
[5] Rakesh Nagi,et al. Cost characterizations of supply chain delivery performance , 2006 .
[6] Renzo Akkerman,et al. Product prioritization in a two-stage food production system with intermediate storage , 2007 .
[7] Auston Marmaduke Kilpatrick,et al. Lean manufacturing principles : a comprehensive framework for improving production efficiency , 1997 .
[8] John G. Wacker,et al. A Theoretical Model of Manufacturing Lead Times and Their Relationship to a Manufacturing Goal Hierarchy , 1996 .
[9] Tao Yang,et al. Batch sizes and lead-time performance in flexible manufacturing systems , 1996 .
[10] Romeo Marian,et al. Analysing the hindrances to the reduction of manufacturing lead-time and their associated environmental pollution , 2009 .