Development and application of a cost-benefit framework for energy reliability using probabilistic methods in network planning and regulation to enhance social welfare : the N-1 rule

Although electricity is crucial to many activities in developed societies, guaranteeing a maximum reliability of supply to end-users is extremely costly. This situation gives rise to a trade-off between the costs and benefits of reliability. The Dutch government has responded to this trade-off by changing the rule stipulating that electricity networks must be able to maintain supply even if one component fails (known as the N-1 rule), even in maintenance situations. This rule was changed by adding the phrase "unless the costs exceed the benefits." We have developed a cost-benefit framework for the implementation and application of this new rule. The framework requires input on failure probability, the cost of supply interruptions to end-users and the cost of investments. A case study of the Dutch grid shows that the method is indeed practicable and that it is highly unlikely that N-1 during maintenance will enhance welfare in the Netherlands. Therefore, including the limitation "unless the costs exceed the benefits" in the rule has been a sensible policy for the Netherlands, and would also be a sensible policy for other countries.

[1]  Roy Billinton,et al.  Cost-benefit analysis of power system reliability: two utility case studies , 1995 .

[2]  Carl Koopmans,et al.  Optimal blackouts: empirical results on reducing the social cost of electricity outages through efficient regional rationing , 2009 .

[3]  J. Hop,et al.  Pricing power outages in the Netherlands , 2009 .

[4]  D. Kirschen,et al.  Why Investments Do Not Prevent Blackouts , 2004 .

[5]  Michael J. Doane,et al.  Consumer Rationality and the Status Quo , 1991 .

[6]  Michael Beenstock,et al.  Response bias in a conjoint analysis of power outages , 1998 .

[7]  M. Munasinghe,et al.  Economic criteria for optimizing power system reliability levels , 1979 .

[8]  Roy Billinton,et al.  Assessment of electric service reliability worth , 1991 .

[9]  D. O. Koval,et al.  Deregulated transmission system reliability planning criteria based on historical equipment performance data , 2000, 2000 IEEE Industrial and Commercial Power Systems Technical Conference. Conference Record (Cat. No.00CH37053).

[10]  Asher Tishler,et al.  Optimal production with uncertain interruptions in the supply of electricity : Estimation of electricity outage costs , 1993 .

[11]  P. Serra,et al.  Outage costs in Chilean industry , 1997 .

[12]  M. Ilić,et al.  A Quantitative Analysis of the Relationship Between Congestion and Reliability in Electric Power Networks , 2007 .

[13]  W. R. Day,et al.  Service interruptions: the customers' views , 1993 .

[14]  Douglas W. Caves,et al.  The Cost of Electric Power Interruptions in the Industrial Sector: Estimates Derived from Interruptible Service Programs , 1992 .

[15]  M. D. Nooij,et al.  The value of supply security The cost of power interruptions: Economic input for damage reduction and investment in networks , 2007 .

[16]  P. Serra,et al.  Outage Cost in Chilean Industry , 1996 .

[17]  Arun P. Sanghvi,et al.  Economic costs of electricity supply interruptions: US and foreign experience , 1982 .