Optimal short term scheduling of cascaded hydroelectric chain plants with pumped-storage units
暂无分享,去创建一个
[1] O. Nilsson,et al. Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers , 1997 .
[2] C.-a. Li,et al. Implementation of network flow programming to the hydrothermal coordination in an energy management system , 1993 .
[3] J. Waight,et al. Experiences with Mixed Integer Linear Programming-Based Approaches in Short-Term Hydro Scheduling , 2001, IEEE Power Engineering Review.
[4] Nikola Rajaković,et al. A flexible approach to short-term hydro-thermal coordination. II. Dual problem solution procedure , 1996 .
[5] Xiaohong Guan,et al. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs , 1999 .
[6] Peter B. Luh,et al. Optimization-based scheduling of hydrothermal power systems with pumped-storage units , 1994 .
[7] Hong-Chan Chang,et al. Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination , 1996 .