Priority Update Intervals and Anomalies in Dynamic Ratio Type Job Shop Scheduling Rules
暂无分享,去创建一个
[1] John E. Freund,et al. Probability and statistics for engineers , 1965 .
[2] Donald Ervin Knuth,et al. The Art of Computer Programming , 1968 .
[3] G. Enderlein,et al. Miller, I., and J. E. Freund: Probability and Statistics for Engineers. Prentice‐Hall, Englewood Cliffs, New Jersey 1965. 432 S., Preis 96. s. , 1968 .
[4] Richard K. Nance. On Time Flow Mechanisms for Discrete System Simulation , 1971 .
[5] Donald C Carroll,et al. Heuristic sequencing of single and multiple component jobs. , 1965 .
[6] John L. Colley,et al. Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System , 1966 .
[7] Nabil R. Adam,et al. Priority updating procedures in dynamic job shop simulation studies: the impact on measures of performance under different due date assignment rules , 1979 .
[8] Jr. William Kenneth Wickham. Time flow mechanisms for discrete event simulation models , 1971 .
[9] George S. Fishman,et al. Solution of Large Networks by Matrix Methods , 1976, IEEE Transactions on Systems, Man, and Cybernetics.