Simulation of Coordinated Market Grid Operations considering Uncertainties

Within the venture “REGEES” (REGenerative rEnewable Electricity System) a new approach for a Coordinated Market Grid Operation Management (CMGOM) was developed. This approach is investigated in a simulation considering uncertainties. Therefore, the energy time series generator as a method to generate time series for demand and feed-in is described and used to generate simulation input in the form of forecast-scenarios for load and feed-in. Uncertainties in the form of forecast errors and stochastic time series properties are taken into account. The optimization problem, which represents the mathematical description for the acquisition and balancing process of the Balance Responsible Party (BRP), is introduced. Finally, the energy system simulation is described for a test case in order to evaluate the CMGOM approach with consideration of uncertainty. For this purpose, deterministic optimization and two versions of optimization with uncertainties are compared.