ECONOMIC VIABILITY TO BeO-UO2FUEL BURNUP EXTENSION
暂无分享,去创建一个
Sungsig Bang | Yanghon Chung | Sungki Kim | Wonil Ko | Hong-Chul Kim | Shripad T. Revankar | S. Revankar | Yanghon Chung | W. Ko | Hong-Chul Kim | Sungki Kim | Sungsig Bang
[1] Erich A Schneider,et al. Cost analysis of the US spent nuclear fuel reprocessing facility , 2009 .
[2] Jong-Won Choi,et al. ASSESSMENT OF THE COST OF UNDERGROUND FACILITIES OF A HIGH-LEVEL WASTE REPOSITORY IN KOREA , 2006 .
[3] Michael J. Driscoll,et al. Optimized Core Design of a Supercritical Carbon Dioxide-Cooled Fast Reactor , 2008 .
[4] Ji-Young Kim,et al. ASSESSMENT OF THE SAFETY OF ULCHIN NUCLEAR POWER PLANT IN THE EVENT OF TSUNAMI USING PARAMETRIC STUDY , 2011 .
[5] K. H. Sarma,et al. New processing methods to produce silicon carbide and beryllium oxide inert matrix and enhanced thermal conductivity oxide fuels , 2006 .
[6] J. Wróbel,et al. Cost assessment in design of low volume manufacture machines , 2008 .
[7] W. J. Wright. Availability and cost of nuclear-grade beryllium oxide , 1964 .
[8] Li Qian,et al. Activity-based cost management for design and development stage , 2003 .