Summarization of the Continuous Box Girder Construction of Jieyang Separated Overpass Bridge

Jieyang Separated Overpass Bridge is a separated overpass bridge in the southwest section of Yuncheng Surround Urban Superhighway with the central pile number of K12+239.This paper introduces the concrete pouring of continuous box girder of main structure of the bridge and the tension construction technology.