Lateral Moving of Prestressed T-Beam with 50 m Long

The paper analyzes schemes for lateral moving of thirty concrete T-type beams each with 50 m long,prestressed by post-tensioning method,on Huanghe River Bridge engineering,accordingly proves the calculation of the beam reinforcing measures and puts forward the schemes for lateral moving of 50m T-type beam,and the schemes are being put into effect.