Minimizing makespan of a resource-constrained scheduling problem: A hybrid greedy and genetic algorithms
暂无分享,去创建一个
Mohd Khairol Anuar Mohd Ariffin | Aidin Delgoshaei | B.T.H.T. Baharudin | Zulkiflle Leman | M. Ariffin | Z. Leman | B. Baharudin | Aidin Delgoshaei
[1] R. Tavakkoli-Moghaddam,et al. A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS , 2008 .
[2] Kin Keung Lai,et al. Genetic algorithm-based multi-criteria project portfolio selection , 2012, Ann. Oper. Res..
[3] Seyed Taghi Akhavan Niaki,et al. Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: two meta-heuristic algorithms , 2013 .
[4] Manuel Castejón Limas,et al. Effort estimates through project complexity , 2011, Ann. Oper. Res..
[5] S. Selcuk Erenguc,et al. Project Scheduling Problems: A Survey , 1993 .
[6] Mohamed Haouari,et al. A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling , 2008, Comput. Ind. Eng..
[7] Jirachai Buddhakulsomsiri,et al. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting , 2006, Eur. J. Oper. Res..
[8] Mohd Khairol A. Arifin,et al. Manufacturing and Properties of Quartz (SiO2) Particulate Reinforced Al-11.8%Si Matrix Composites , 2012 .
[9] R. Leus,et al. The trade-off between stability and makespan in resource-constrained project scheduling , 2004 .
[10] Michele Lombardi,et al. A min-flow algorithm for Minimal Critical Set detection in Resource Constrained Project Scheduling , 2012, Artif. Intell..
[11] Keith Worden,et al. Genetic Optimisation of Machine Tool Paths , 2004 .
[12] Chang Sup Sung,et al. A project activity scheduling problem with net present value measure , 1994 .
[13] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[14] Mario Vanhoucke,et al. A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[15] M. Suresh,et al. Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times , 2015, Asia Pac. J. Oper. Res..
[16] A. S. Azfanizam,et al. A Backward Approach for Maximizing Net Present Value of Multimode Pre-emptive Resource-Constrained Project Scheduling Problem with Discounted Cash Flows Using Simulated Annealing Algorithm , 2014, International Journal of Industrial Engineering and Management.
[17] Sönke Hartmann,et al. Project Scheduling with Multiple Modes: A Genetic Algorithm , 2001, Ann. Oper. Res..
[18] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[19] Concepción Maroto,et al. A Robust Genetic Algorithm for Resource Allocation in Project Scheduling , 2001, Ann. Oper. Res..
[20] Shahram Shadrokh,et al. Bi-objective resource-constrained project scheduling with robustness and makespan criteria , 2006, Appl. Math. Comput..
[21] Stephen F. Smith,et al. From precedence constraint posting to partial order schedules: A CSP approach to Robust Scheduling , 2007, AI Commun..
[22] Baoding Liu,et al. Fuzzy project scheduling problem and its hybrid intelligent algorithm , 2010 .
[23] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .
[24] J. H. Patterson,et al. An Algorithm for a general class of precedence and resource constrained scheduling problems , 1989 .
[25] Kum Khiong Yang,et al. Scheduling a project to maximize its net present value: An integer programming approach , 1993 .
[26] María Pilar Tormos,et al. Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling , 2001, Ann. Oper. Res..
[27] Erik Demeulemeester,et al. The use of buffers in project management: The trade-off between stability and makespan , 2004 .
[28] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[29] Chung-Yee Lee,et al. Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases , 2001, Ann. Oper. Res..
[30] N. R. Achuthan,et al. Project Scheduling under Time Dependent Costs – A Branch and Bound Algorithm , 2001, Ann. Oper. Res..
[31] Carlo Vercellis,et al. Hierarchical models for multi-project planning and scheduling , 1993 .
[32] Napsiah Ismail,et al. Integrated Scheduling of Quay Cranes and Automated Lifting Vehicles in Automated Container Terminal with Unlimited Buffer Space , 2013, ICSS.
[33] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .
[34] Arno Sprecher,et al. An exact algorithm for project scheduling with multiple modes , 1997 .
[35] Arno Sprecher,et al. Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements , 2000 .
[36] Gündüz Ulusoy,et al. Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows , 2001, Ann. Oper. Res..
[37] Zohar Laslo. Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses , 2010 .
[38] Mitsuo Gen,et al. Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling , 2005, Comput. Ind..
[39] YoungSu Yun,et al. Hybrid genetic algorithm with adaptive local search scheme , 2006, Comput. Ind. Eng..