Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times
暂无分享,去创建一个
[1] Ming Liu,et al. Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method , 2014 .
[2] Mostafa Zandieh,et al. Earliness and Tardiness Minimizing on a Realistic Hybrid Flowshop Scheduling with Learning Effect by Advanced Metaheuristic , 2012, Arabian Journal for Science and Engineering.
[3] Mostafa Zandieh,et al. A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic , 2009, Expert Syst. Appl..
[4] Paveena Chaovalitwongse,et al. Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria , 2008 .
[5] Mostafa Zandieh,et al. A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop , 2013 .
[6] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[7] Lionel Amodeo,et al. New multi-objective method to solve reentrant hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[8] M. Zandieh,et al. Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers , 2012 .
[9] Mostafa Zandieh,et al. An Efficient Hybrid Algorithm for a Bi-objectives Hybrid Flow Shop Scheduling , 2018 .
[10] Nasser Salmasi,et al. A two-criteria objective function flexible flowshop scheduling problem with machine eligibility constraint , 2013 .
[11] Lin Danping,et al. A review of the research methodology for the re-entrant scheduling problem , 2011 .
[12] Suk Joo Bae,et al. Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm , 2011, Comput. Ind. Eng..
[13] Kien Ming Ng,et al. A hybrid water flow algorithm for multi-objective flexible flow shop scheduling problems , 2013 .
[14] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .
[15] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[16] M. Zandieh,et al. Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics , 2013 .
[17] Saeed Yaghoubi,et al. Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints , 2014, Int. J. Comput. Integr. Manuf..
[18] Mostafa Zandieh,et al. An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machines , 2010 .
[19] Mostafa Zandieh,et al. Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: water flow-like algorithm approach , 2012 .
[20] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[21] Shih-Wei Lin,et al. Bi-objective reentrant hybrid flowshop scheduling: an iterated Pareto greedy algorithm , 2014 .
[22] Gupta J.N.D.. TWO-STAGE HYBRID FLOW SHOP SCHEDULING PROBLEM , 1988 .
[23] M. Zandieh,et al. Bi-objective hybrid flow shop scheduling: a new local search , 2013 .
[24] Mostafa Zandieh,et al. An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness , 2009, Expert Syst. Appl..
[25] Wenhong Tian,et al. A distributed coevolutionary algorithm for multiobjective hybrid flowshop scheduling problems , 2014 .
[26] Shaya Sheikh,et al. Multi-objective flexible flow lines with due window, time lag, and job rejection , 2013 .