Topological mapping and assessment of multiple settlement time series in deep excavation: A complex network perspective

Abstract This study proposed a novel methodology that integrates complex network theory and multiple time series to enhance the systematic understanding of the daily settlement behavior in deep excavation. The original time series of ground surface, surrounding buildings, and structure settlement instrumentation data over an excavation time period were measured into a similarity matrix with correlation coefficients. A threshold was then determined and binarized into adjacent matrix to identify the optimal topology and structure of the complex network. The reconstructed settlement network has nodes corresponding to multiple settlement time series individually and edges regarded as nonlinear relationships between them. A deep excavation case study of the metro station project in the Wuhan Metro network, China, was applied to validate the feasibility and potential value of the proposed approach. Results of the topological analysis corroborate a small-world phenomenon with highly compacted interactions and provide the assessment of the significance among multiple settlement time series. This approach, which provides a new way to assess the safety monitoring data in underground construction, can be implemented as a tool for extracting macro- and micro-level decision information from multiple settlement time series in deep excavation from complex system perspectives.

[1]  Richard J. Finno,et al.  Distributions of ground movements parallel to deep excavations in clay , 2006 .

[2]  Duanbing Chen,et al.  Vital nodes identification in complex networks , 2016, ArXiv.

[3]  Peter E.D. Love,et al.  Predicting Safety Risks in Deep Foundation Pits in Subway Infrastructure Projects: Support Vector Machine Approach , 2017, J. Comput. Civ. Eng..

[4]  Olaf Sporns,et al.  Complex network measures of brain connectivity: Uses and interpretations , 2010, NeuroImage.

[5]  Lukumon O. Oyedele,et al.  Big Data in the construction industry: A review of present status, opportunities, and future trends , 2016, Adv. Eng. Informatics.

[6]  Jürgen Kurths,et al.  Recurrence networks—a novel paradigm for nonlinear time series analysis , 2009, 0908.3447.

[7]  Qian Qihu,et al.  Present state, problems and development trends of urban underground space in China , 2016 .

[8]  Gordon Tung-Chin Kung,et al.  Comparison of excavation-induced wall deflection using top-down and bottom-up construction methods in Taipei silty clay , 2009 .

[9]  Xiang Li,et al.  Bridging Time Series Dynamics and Complex Network Theory with Application to Electrocardiogram Analysis , 2012, IEEE Circuits and Systems Magazine.

[10]  Jinjun Tang,et al.  Exploring dynamic property of traffic flow time series in multi-states based on complex networks: Phase space reconstruction versus visibility graph , 2016 .

[11]  Jinjun Tang,et al.  Characterizing traffic time series based on complex network theory , 2013 .

[12]  J. Kwapień,et al.  Physical approach to complex systems , 2012 .

[13]  Rebecca J. Yang,et al.  Stakeholder-associated risks and their interactions in complex green building projects: a social network model , 2014 .

[14]  Feng Yu,et al.  Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel , 2013 .

[15]  Miroslaw J. Skibniewski,et al.  Characterizing time series of near-miss accidents in metro construction via complex network theory , 2017 .

[16]  Ying Zhou,et al.  Implementation of augmented reality for segment displacement inspection during tunneling construction , 2017 .

[17]  Yun Long Visibility graph network analysis of gold price time series , 2013 .

[18]  Lieyun Ding,et al.  Safety barrier warning system for underground construction sites using Internet-of-Things technologies , 2017 .

[19]  E. Cai,et al.  Monitoring of chemical industrial processes using integrated complex network theory with PCA , 2015 .

[20]  Chang-Yu Ou,et al.  Shape of ground surface settlement profiles caused by excavation , 1998 .

[21]  Francesco Serinaldi,et al.  Irreversibility and complex network behavior of stream flow fluctuations , 2016 .

[22]  G. Ambika,et al.  Can recurrence networks show small-world property? , 2015, 1509.04528.

[23]  Seokho Chi,et al.  Development of a data mining-based analysis framework for multi-attribute construction project information , 2012, Adv. Eng. Informatics.

[24]  Amin Hammad,et al.  Dynamic equipment workspace generation for improving earthwork safety using real-time location system , 2015, Adv. Eng. Informatics.

[25]  Lieyun Ding,et al.  Application of 4D visualization technology for safety management in metro construction , 2013 .

[26]  Khaled M. Abo-Al-Ez,et al.  A data mining based load forecasting strategy for smart electrical grids , 2016, Adv. Eng. Informatics.

[27]  Rotoli Francesco,et al.  Complex railway systems: capacity and utilisation of interconnected networks , 2016 .

[28]  Louis Ngai Yuen Wong,et al.  Environmental risk management for a cross interchange subway station construction in China , 2011 .

[29]  Wei-Dong Dang,et al.  Multiscale limited penetrable horizontal visibility graph for analyzing nonlinear time series , 2016, Scientific Reports.

[30]  Lixin Tian,et al.  Characterizing air quality data from complex network perspective , 2016, Environmental Science and Pollution Research.

[31]  Youssef M A Hashash,et al.  Comparison of two inverse analysis techniques for learning deep excavation response , 2010 .

[32]  Q Z Yu,et al.  Analysis of factors influencing safety management for metro construction in China. , 2014, Accident; analysis and prevention.

[33]  Lieyun Ding,et al.  Development of web-based system for safety risk early warning in urban metro construction , 2013 .

[34]  Youssef M. A. Hashash,et al.  Simplified Model for Wall Deflection and Ground-Surface Settlement Caused by Braced Excavation in Clays , 2007 .

[35]  A. Snarskii,et al.  From the time series to the complex networks: The parametric natural visibility graph , 2012, 1208.6365.

[36]  Yang Rao,et al.  Formulating project-level building information modeling evaluation framework from the perspectives of organizations: A review , 2017 .

[37]  Ernestina Menasalvas Ruiz,et al.  Combining complex networks and data mining: why and how , 2016, bioRxiv.

[38]  Eshel Ben-Jacob,et al.  Dependency Network and Node Influence: Application to the Study of Financial Markets , 2012, Int. J. Bifurc. Chaos.

[39]  Burcu Akinci,et al.  Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD , 2014 .

[40]  Ying-Cheng Lai,et al.  Universal data-based method for reconstructing complex networks with binary-state dynamics. , 2015, Physical review. E.

[41]  Dewang Chen,et al.  Data-driven train operation models based on data mining and driving experience for the diesel-electric locomotive , 2016, Adv. Eng. Informatics.

[42]  Markus König,et al.  Assessment and weighting of meteorological ensemble forecast members based on supervised machine learning with application to runoff simulations and flood warning , 2017, Adv. Eng. Informatics.

[43]  Bin Deng,et al.  Characterizing electrical signals evoked by acupuncture through complex network mapping: A new perspective on acupuncture , 2011, Comput. Methods Programs Biomed..

[44]  E. Ben-Jacob,et al.  Challenges in network science: Applications to infrastructures, climate, social systems and economics , 2012 .

[45]  Youssef M A Hashash,et al.  Interplay between Field Measurements and Soil Behavior for Capturing Supported Excavation Response , 2010 .

[46]  Na Wang,et al.  Visibility graph analysis on quarterly macroeconomic series of China based on complex network theory , 2012 .

[47]  Erik Westman,et al.  Ground control monitoring of retreat room–and–pillar mine in Central Appalachia , 2017 .

[48]  Ian F. C. Smith,et al.  Combined Model-Free Data-Interpretation Methodologies for Damage Detection during Continuous Monitoring of Structures , 2013, J. Comput. Civ. Eng..

[49]  Madhav Prasad Nepal,et al.  Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects , 2017, Adv. Eng. Informatics.