Planning Horizon Procedures for Machine Replacement Models with Several Possible Replacement Alternatives
暂无分享,去创建一个
This paper develops a forward algorithm and planning horizon procedures for an important machine replacement model where it is assumed that the technological environment is improving over time and that the machine-in-use can be replaced by any of the several different kinds of machines available at that time. The set of replacement alternatives may include (i) new machines with different types of technologies such as labor- and capital- intensive, (ii) used machines, (iii) repairs and/or improvements which affect the performance characteristics of the existing machine, and so forth. The forward dynamic programming algorithm in the paper can be used to solve a finite horizon problem. The planning horizon results give a procedure to identify the forecast horizon T such that the optimal replacement decision for the first machine based on the forecast of machine technology until period T remains optimal for any problem with horizon longer than T and, for that matter, for the infinite horizon problem. A flow chart and a numerical example have been included to illustrate the algorithm.
[1] Rolf A. Lundin,et al. Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results , 1975, Oper. Res..
[2] William P. Pierskalla,et al. A survey of maintenance models: The control and surveillance of deteriorating systems , 1976 .
[3] Birger Rapp. Models for optimal investment and maintenance decisions , 1974 .
[4] Thomas E. Morton,et al. A Mixed Optimization Technique for the Generalized Machine Replacement Problem , 1971 .