Subcontractor selection with additive ratio assessment method

During the last decades, especially in large-scale construction projects, it is one of the widely applied strategies that the main contractors work with many subcontractors and overtake a large part of the works. This trend brings out the problem of selection of subcontractors. The classical approaches in the construction industry to select the subcontractor are the general practice reference, the lowest bid, and the familiarity. This creates major risks for contractors since the construction sector involves time-limited projects with a large variety of complex works. Putting the subcontractor selection on a scientific basis and minimizing the risks by choosing the most appropriate subcontractor among the bidders for a particular type of work, require for the construction industry to determine not only consistent and efficient but also uncomplicated and plain model. Instead of the widespread conventional application, this study represents a new alternative approach to the subcontractor selection with Additive Ratio Assessment Method, which is one of the multi-criteria decision-making techniques. Additive Ratio Assessment Method is quite practical and convenient to use among the other multi-criteria decision-making methods. This study aimed to demonstrate the use of Additive Ratio Assessment Method on sub-contractor selection problems by exemplifying a real case application.

[1]  Gábor Kovács,et al.  Applying a multi-criteria decision methodology in the implementation of tenders for the acquisition of the infrastructure of logistics systems , 2009 .

[2]  Serdar Ulubeyli,et al.  Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects , 2015 .

[3]  S. Love,et al.  Subcontractor Partnering: I'll Believe It When I See It , 1997 .

[4]  H Odeyinka,et al.  Tender Evaluation Methods in Construction Projects: A Comparative Case Study , 2006 .

[5]  S. Rowlinson,et al.  Quality relationships: partnering in the construction supply chain , 2000 .

[6]  Glenn Steel,et al.  The selection of subcontractors: is price the major factor? , 2007 .

[7]  M. Hosseini,et al.  A survey of the factors affecting the productivity of construction projects in Iran , 2012 .

[8]  Gul Polat,et al.  Subcontractor selection using the integration of the AHP and PROMETHEE methods , 2015 .

[9]  Teik Hua Law,et al.  Review of Subcontracting Practice in Construction Industry , 2012 .

[10]  Mohammad S. El-Mashaleh,et al.  A Construction Subcontractor Selection Model , 2009 .

[11]  Shpend Imeri Key Performance Criteria For Vendor Selection – A Literature Review , 2013 .

[12]  Michał Krzemiński The selection of construction sub-contractors using the fuzzy sets theory , 2015 .

[13]  Mark Goh,et al.  Decision Mechanism for Supplier Selection Under Sustainability , 2017, Int. J. Inf. Technol. Decis. Mak..

[14]  Edmundas Kazimieras Zavadskas,et al.  A new additive ratio assessment (ARAS) method in multicriteria decision‐making , 2010 .

[15]  Panos L. Lorentziadis Post-objective determination of weights of the evaluation factors in public procurement tenders , 2010, Eur. J. Oper. Res..

[16]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[17]  S. T Ng,et al.  Client and consultant perspectives of prequalification criteria , 1999 .

[18]  A. Kakabadse,et al.  Outsourcing: Current and future trends , 2005 .

[19]  V. E. Zhukovin,et al.  A Fuzzy Multicriteria Decision Making Model , 1987 .

[20]  F. Çebi,et al.  An integrated approach for supplier selection , 2003 .

[21]  R. Pietroforte,et al.  Multi-criteria bid evaluation of public projects , 2011 .

[22]  Mohan M. Kumaraswamy,et al.  Improved subcontractor selection employing partnering principles , 2000 .

[23]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[24]  The process of selecting subcontractors, Case Laitex Oy , 2011 .

[25]  Ali A. Shash BIDDING PRACTICES OF SUBCONTRACTORS IN COLORADO , 1998 .

[26]  Zenonas Turskis,et al.  Multi‐attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique , 2008 .

[27]  Mohan M. Kumaraswamy,et al.  Relational Selection for Collaborative Working Arrangements , 2005 .

[28]  Ekambaram Palaneeswaran,et al.  Identifying best practices in contractor selection for enhanced harmony and profit , 1999 .

[29]  Adrian J. Smith Estimating, Tendering and Bidding for Construction , 1995 .

[30]  Edmundas Kazimieras Zavadskas,et al.  Contractor selection of construction in a competitive environment , 2008 .

[31]  Reza Khorramshahgol,et al.  An Integrated Strategic Approach to supplier Evaluation and Selection , 2012, Int. J. Inf. Technol. Decis. Mak..

[32]  Brenda McCabe,et al.  Introduction Construction , 2022 .

[33]  X. Huang An Analysis of the Selection of Project Contractor in the Construction Management Process , 2011 .

[34]  Ekambaram Palaneeswaran,et al.  Contractor Selection for Design/Build Projects , 2000 .

[35]  A. Enshassi The contractor – subcontractor relationship : the general contractor ’ s view , 2008 .

[36]  Maryam Darvish,et al.  Application of the graph theory and matrix methods to contractor ranking , 2009 .

[37]  Ali Görener,et al.  Bulanık TOPSIS Metodu ile Karar Verme: İnşaat Projelerinde Yüklenici Seçimi(Decision Making Through the Fuzzy TOPSIS Method: Contractor Selection in Construction Projects) , 2016 .

[38]  Tiesong Hu,et al.  A fuzzy neural network approach for contractor prequalification , 2001 .

[39]  Daniel R. Krause,et al.  Toward a measure of competitive priorities for purchasing , 2001 .

[40]  Hamidreza Abbasianjahromi,et al.  A FRAMEWORK FOR SUBCONTRACTOR SELECTION IN THE CONSTRUCTION INDUSTRY , 2013 .

[41]  Gary W. Dickson,et al.  AN ANALYSIS OF VENDOR SELECTION SYSTEMS AND DECISIONS , 1966 .

[42]  Abdellah Azmani,et al.  The Choice of the Best Proposal in Tendering with AHP Method: Case of Procurement of IT Master Plan's Realization , 2015 .

[43]  Vito Albino,et al.  A neural network application to subcontractor rating in construction firms , 1998 .

[44]  Serdar Ulubeyli,et al.  Subcontractor selection practices in international construction projects , 2010 .

[45]  V. Rawat,et al.  Estimating and Tendering for construction work , 2016 .

[46]  R. Favié,et al.  The best criteria for the selection of contractors in the Dutch construction industry , 2007 .

[47]  Seyhan Sipahi,et al.  A multi‐criteria model for bidding evaluation , 2010 .

[48]  Y. Ilker Topcu,et al.  A decision model proposal for construction contractor selection in Turkey , 2004 .