Single-machine two-agent scheduling involving a just-in-time criterion

We study a set of single-machine two-agent scheduling problems where the performance measure of the first agent, , is the weighted number of jobs completed exactly at the due date, i.e. completed in a just-in-time mode. The performance measure of the second agent, , is either the makespan, the total completion times or the weighted number of jobs completed exactly at the due date. For each combination of performance measures of the two agents, we study four different variations of the problem. We show that all four-problem variations are strongly -hard for when the performance measure of the second agent is either the makespan or the total completion time, even if all of the first agent’s weights are equal. We also study the special case of these problems where the job processing times of the second agent are all equal. For this special case, we prove that three variations of this problem are ordinary -hard with respect to the instance size, while all four problem variations are polynomial solvable with respect to the number of jobs. For the problem where the performance measure of both agents is the weighted number of jobs completed at the due date, we show that one problem variation is solvable in polynomial time, while all other three variations are ordinary -hard.

[1]  Gur Mosheiov,et al.  Single machine scheduling to minimize the number of early and tardy jobs , 1996, Comput. Oper. Res..

[2]  Jose M. Framiñan,et al.  A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems , 2014, Eur. J. Oper. Res..

[3]  Weiping Shang,et al.  A note on the scheduling with two families of jobs , 2005, J. Sched..

[4]  Wen-Chiung Lee,et al.  A single-machine scheduling problem with two-agent and deteriorating jobs , 2010 .

[5]  Kenneth Steiglitz,et al.  Combinatorial Optimization: Algorithms and Complexity , 1981 .

[6]  Chung-Yee Lee,et al.  Machine scheduling with an availability constraint , 1996, J. Glob. Optim..

[7]  Ameur Soukhal,et al.  Two-Agent Scheduling on an Unbounded Serial Batching Machine , 2012, ISCO.

[8]  Errol L. Lloyd,et al.  on the K-coloring of Intervals , 1991, Discret. Appl. Math..

[9]  Jonathan Cole Smith,et al.  A Multiple-Criterion Model for Machine Scheduling , 2003, J. Sched..

[10]  Dvir Shabtay,et al.  Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems , 2010, Journal of Scheduling.

[11]  Ron Shamir,et al.  Strongly Polynomial Algorithms for the High Multiplicity Scheduling Problem , 1991, Oper. Res..

[12]  Frank Werner,et al.  Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey , 2004, Math. Comput. Model..

[13]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[14]  Esther M. Arkin,et al.  Scheduling jobs with fixed start and end times , 1987, Discret. Appl. Math..

[15]  Stefano Giordano,et al.  A survey on multi-constrained optimal path computation: Exact and approximate algorithms , 2010, Comput. Networks.

[16]  Alessandro Agnetis,et al.  Scheduling Problems with Two Competing Agents , 2004, Oper. Res..

[17]  Dvir Shabtay,et al.  The just-in-time scheduling problem in a flow-shop scheduling system , 2012, Eur. J. Oper. Res..

[18]  Gur Mosheiov,et al.  Single machine batch scheduling with two competing agents to minimize total flowtime , 2011, Eur. J. Oper. Res..

[19]  Shao Chin Sung,et al.  Maximizing Weighted number of Just-in-Time Jobs on Unrelated Parallel Machines , 2005, J. Sched..

[20]  Byung-Cheon Choi,et al.  Maximizing the weighted number of just-in-time jobs in flow shop scheduling , 2007 .

[21]  Joseph Y.-T. Leung,et al.  Competitive Two-Agent Scheduling and Its Applications , 2010, Oper. Res..

[22]  Refael Hassin,et al.  Approximation Schemes for the Restricted Shortest Path Problem , 1992, Math. Oper. Res..

[23]  Chengbin Chu,et al.  A survey of scheduling with deterministic machine availability constraints , 2010, Comput. Ind. Eng..

[24]  T. C. Edwin Cheng,et al.  An Improved FPTAS for Mobile Agent Routing with Time Constraints , 2011, J. Univers. Comput. Sci..