Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring
暂无分享,去创建一个
Jun Zhang | Wei Hu | Zheng Li | Deng-hua Zhong | Binping Wu | Jun Zhang | D. Zhong | Wei Hu | Bin-ping Wu | Zheng Li
[1] Vince Thomson,et al. A review of research on cost of quality models and best practices , 2006 .
[2] Gholamreza Heravi,et al. Cost of Quality Evaluation in Mass-Housing Projects in Developing Countries , 2014 .
[3] Madjid Tavana,et al. A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems , 2014, Expert Syst. Appl..
[4] Xi Jin,et al. Multi-objective optimization of water supply network rehabilitation with non-dominated sorting Genetic Algorithm-II , 2008 .
[5] Osama Moselhi,et al. RFID+ for Tracking Earthmoving Operations , 2012 .
[6] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[7] T. Saaty. How to Make a Decision: The Analytic Hierarchy Process , 1990 .
[8] Önder Halis Bettemir,et al. A hybrid genetic algorithm for the discrete time-cost trade-off problem , 2012, Expert Syst. Appl..
[9] I. Yang. Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance , 2011 .
[10] 徐晓东,et al. Single crystal β-Ga 2 O 3 : Cr grown by floating zone technique and its optical properties , 2007 .
[11] Edward G. Schilling,et al. Juran's Quality Handbook , 1998 .
[12] Li Zilong,et al. Compaction quality assessment of earth-rock dam materials using roller-integrated compaction monitoring technology , 2014 .
[13] Gholamreza Heravi,et al. Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects , 2014 .
[14] Jingjing Du,et al. Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization , 2014 .
[15] Bo Cui,et al. Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam , 2009 .
[16] Jianrong Tan,et al. Robust optimization of structural dynamic characteristics based on adaptive Kriging model and CNSGA , 2015 .
[17] Can Akkan,et al. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem , 2005, Eur. J. Oper. Res..
[18] Carl T. Haas,et al. Assignment and Allocation Optimization of Partially Multiskilled Workforce , 2002 .
[19] Mohamed K. Omar,et al. An improved model for the cost of quality , 2014 .
[20] Chung-Wei Feng,et al. The LP/IP hybrid method for construction time-cost trade-off analysis , 1996 .
[21] Berardo Naticchia,et al. Design and first development of an automated real‐time safety management system for construction sites , 2009 .
[22] Donghai Liu,et al. Real-Time Quality Monitoring and Control of Highway Compaction , 2016 .
[23] Mohammad Reza Nikoo,et al. A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects , 2015, Expert Syst. Appl..
[24] Amir Abbas Najafi,et al. A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations , 2014, Comput. Oper. Res..
[25] Omid Bozorg Haddad,et al. Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO , 2012, Expert Syst. Appl..
[26] Khaled A El-Rayes,et al. Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .
[27] C. E. SHANNON,et al. A mathematical theory of communication , 1948, MOCO.
[28] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[29] Zhang Ping. Theory and application of construction simulation for high core rock-fill dam based on real-time monitoring , 2009 .
[30] Genichii Taguchi,et al. Introduction to quality engineering. designing quality into products a , 1986 .
[31] Prabuddha De,et al. Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks , 1997, Oper. Res..
[32] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[33] Julio C. Martinez,et al. Reduction of Short-Interval GPS Data for Construction Operations Analysis , 2005 .
[34] Neil N. Eldin,et al. DYNAMIC PROGRAMMING ApPROACH TO SCHEDULING OF NONSERIAL LINEAR PROJECT , 1996 .
[35] Min-Yuan Cheng,et al. Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem , 2015, Knowl. Based Syst..
[36] C. Hwang. Multiple Objective Decision Making - Methods and Applications: A State-of-the-Art Survey , 1979 .
[37] Manoj Kumar Tiwari,et al. A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project , 2013, Eng. Appl. Artif. Intell..
[38] Nicole Radziwill. Cost of Quality (CoQ) metrics for telescope operations and project management , 2006, SPIE Astronomical Telescopes + Instrumentation.
[39] Mario Vanhoucke,et al. The discrete time/cost trade-off problem: extensions and heuristic procedures , 2007, J. Sched..
[40] Khaled A El-Rayes,et al. Scheduling of repetitive projects with cost optimization , 1993 .
[41] Yixiong Feng,et al. Interval multiobjective optimization of structures based on radial basis function, interval analysis, and NSGA-II , 2014 .
[42] Akif Asil Bulgak,et al. A cost of quality decision support model for lean manufacturing: activity‐based costing application , 2013 .
[43] John F. Muth,et al. A Dynamic Programming Algorithm for Decision CPM Networks , 1979, Oper. Res..
[44] Jing Sun,et al. Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data , 2012 .
[45] Amir Azaron,et al. A genetic algorithm approach for the time-cost trade-off in PERT networks , 2005, Appl. Math. Comput..
[46] Bo Cui,et al. Real-time compaction quality monitoring of high core rockfill dam , 2011 .
[47] Wang Cheng-en,et al. A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution , 2009 .
[48] Kalyanmoy Deb,et al. Muiltiobjective Optimization Using Nondominated Sorting in Genetic Algorithms , 1994, Evolutionary Computation.