Mining Shop-Floor Data for Preventive Maintenance Management: Integrating Probabilistic and Predictive Models☆

Abstract Well-defined intervals between preventive maintenance inspections help increase the availability of process equipment. This work integrates probabilistic and predictive models constructed from event logs information, through process mining techniques, to estimate the variations of process cycle time. A function for equipment availability is defined and gradual changes in intervals between maintenance inspections are performed until the wasted time for this function is minimized and the best interval is found. Different scenarios can be analyzed simulating variations in probabilities of activities occurrence, providing better support in scheduling maintenance activities. Results show that losses can be reduced by optimizing the intervals between maintenance inspections.

[1]  Huifang Wang,et al.  Research on Multiobjective Group Decision-Making in Condition-Based Maintenance for Transmission and Transformation Equipment Based on D-S Evidence Theory , 2015, IEEE Transactions on Smart Grid.

[2]  Qi Gao,et al.  Maintenance interval decision models for a system with failure interaction , 2015 .

[3]  Xinyu Shao,et al.  A cost‐based selective maintenance decision‐making method for machining line , 2011, Qual. Reliab. Eng. Int..

[4]  Benoît Iung,et al.  Maintenance alternative integration to prognosis process engineering , 2007 .

[5]  Cher Ming Tan,et al.  Optimal maintenance strategy of deteriorating system under imperfect maintenance and inspection using mixed inspection scheduling , 2013, Reliab. Eng. Syst. Saf..

[6]  Lihui Wang,et al.  Current status and advancement of cyber-physical systems in manufacturing , 2015 .

[7]  Ralph L. Keeney,et al.  Common Mistakes in Making Value Trade-Offs , 2002, Oper. Res..

[8]  Wil M. P. van der Aalst,et al.  Process Mining - Discovery, Conformance and Enhancement of Business Processes , 2011 .

[9]  P. O'Connor,et al.  Practical Reliability Engineering , 1981 .

[10]  Adiel Teixeira de Almeida,et al.  A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis , 2009, Reliab. Eng. Syst. Saf..

[11]  Adiel Teixeira de Almeida,et al.  Multicriteria Model for Selection of Preventive Maintenance Intervals , 2012, Qual. Reliab. Eng. Int..

[12]  David W. Coit,et al.  Establishment of the optimal time interval between periodic inspections for redundant systems , 2014, Reliab. Eng. Syst. Saf..

[13]  James Gao,et al.  Web-based Process Planning for Machine Tool Maintenance and Services , 2015 .

[14]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[15]  Abdur Rahim,et al.  Practical implications of managerial decisions to integrate production scheduling and maintenance , 2015, Int. J. Syst. Assur. Eng. Manag..

[16]  Gwilym M. Jenkins,et al.  Time series analysis, forecasting and control , 1971 .

[17]  Ajit Srividya,et al.  FIS based selection of CM system design parameters from a multi-objective optimisation model using GA , 2011, Int. J. Syst. Assur. Eng. Manag..

[18]  R. L. Keeney,et al.  Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[19]  László Monostori,et al.  ScienceDirect Variety Management in Manufacturing . Proceedings of the 47 th CIRP Conference on Manufacturing Systems Cyber-physical production systems : Roots , expectations and R & D challenges , 2014 .

[20]  Dragan Banjevic,et al.  A myopic policy for optimal inspection scheduling for condition based maintenance , 2015, Reliab. Eng. Syst. Saf..