Hydroelectric unit commitment for power plants composed of distinct groups of generating units
暂无分享,去创建一个
[1] A. Borghetti,et al. An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir , 2008, IEEE Transactions on Power Systems.
[2] A. Rudolf,et al. A genetic algorithm for solving the unit commitment problem of a hydro-thermal power system , 1999 .
[3] S. J. Huang,et al. Enhancement of Hydroelectric Generation Scheduling Using Ant Colony System-Based Optimization Approaches , 2001, IEEE Power Engineering Review.
[4] C. Sagastizábal,et al. Solving the unit commitment problem of hydropower plants via Lagrangian Relaxation and Sequential Quadratic Programming , 2005 .
[5] Takaaki Ohishi,et al. Dynamic dispatch of hydro generating units , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.
[6] E.C. Finardi,et al. Optimal dispatch of hydro generation plants via augmented Lagrangian , 2005, IEEE Power Engineering Society General Meeting, 2005.
[7] L. M. V. G. Pinto,et al. A Decomposition Approach to the Economic Dispatch of Hydrothermal Systems , 1982, IEEE Power Engineering Review.
[8] J.P.S. Catalão,et al. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain , 2010 .
[9] Antonio Frangioni,et al. Large-scale Unit Commitment under uncertainty , 2014, 4OR.
[10] Raouia Taktak,et al. An overview on mathematical programming approaches for the deterministic unit commitment problem in hydro valleys , 2017 .
[11] N.P. Padhy,et al. Unit commitment-a bibliographical survey , 2004, IEEE Transactions on Power Systems.
[12] Yang Jin-Shyr,et al. Short term hydrothermal coordination using multi-pass dynamic programming , 1989 .
[13] Richard E. Rosenthal,et al. GAMS -- A User's Guide , 2004 .
[14] Secundino Soares,et al. Minimum loss predispatch model for hydroelectric power systems , 1997 .
[15] E.L. da Silva,et al. Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming , 2006, IEEE Transactions on Power Systems.
[16] I. Grossmann,et al. A combined penalty function and outer-approximation method for MINLP optimization : applications to distillation column design , 1989 .
[17] A.H. Mantawy,et al. A new tabu search algorithm for the long-term hydro scheduling problem , 2002, LESCOPE'02. 2002 Large Engineering Systems Conference on Power Engineering. Conference Proceedings.
[18] O. Nilsson,et al. Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers , 1997 .
[19] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .