Planning model in reverse logistic
暂无分享,去创建一个
[1] Ronald S. Tibben-Lembke,et al. AN EXAMINATION OF REVERSE LOGISTICS PRACTICES , 2001 .
[2] Stephen C. H. Leung,et al. Production planning for hybrid remanufacturing and manufacturing system with component recovery , 2013, J. Oper. Res. Soc..
[3] Pierre Dejax,et al. Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain , 2012 .
[4] W. L. Ijomah. A tool to improve training and operational effectiveness in remanufacturing , 2008, Int. J. Comput. Integr. Manuf..
[5] A. Charnes,et al. Management Models and Industrial Applications of Linear Programming , 1961 .
[6] Abraham Charnes,et al. Management Models and Industrial Applications of Linear Programming , 1961 .
[7] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[8] S. H. Amin,et al. Coordinating production and recycling decisions with stochastic demand and return , 2010 .
[9] Akshay Mutha,et al. Perspectives in reverse logistics : A review , 2009 .
[10] Sami Kara,et al. Toward integrated product and process life cycle planning—An environmental perspective , 2012 .
[11] ZhangGuoqing,et al. An integrated model for closed-loop supply chain configuration and supplier selection , 2012 .
[12] Saman Hassanzadeh Amin,et al. An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach , 2012, Expert Syst. Appl..
[13] Jianmai Shi,et al. Optimal production and pricing policy for a closed loop system , 2011 .
[14] Bongju Jeong,et al. Supply planning model for remanufacturing system in reverse logistics environment , 2006, Comput. Ind. Eng..
[15] Jean-M. Martel,et al. Méthode Multicritère De Choix D’Un Emplacement: Le Cas D’Un Aeroport Dans Le Nouveau Québec , 1992 .