The effect of low insolation conditions and inverter oversizing on the long‐term performance of a grid‐connected photovoltaic system

The performance of a roof mounted grid-connected photovoltaic (PV) system in Northern Ireland was monitored over 3 years on annual, seasonal and monthly bases. The overall system performance was adversely affected by low insolation conditions; 19% of total incident insolation was absorbed at irradiance level below 200 W/m2 and 67% below 600 W/m2, only 6·2% above 900 W/m2. In summer and winter, the PV and system efficiencies were 9·0 and 8·5%, and 7·8 and 7·5%, respectively and inverter efficiencies were 86·8 and 85·8%, respectively. The inverter for this particular system was oversized; 77% of the total DC energy produced when inverter's operating load was 50% of its rated capacity. The annual average monthly system performance ratio (PR) was 0·61 with seasonal variation 0·59 to 0·63. The average monthly PV, system and inverter efficiencies over the whole monitored period were 8·8, 7·6 and 86·8%, respectively. The main losses of the system were inverter DC/AC conversion loss, inverter threshold loss and low insolation loss. Copyright © 2007 John Wiley & Sons, Ltd.

[1]  R. Gottschalg,et al.  Actual PV module performance including spectral losses in the UK , 2005, Conference Record of the Thirty-first IEEE Photovoltaic Specialists Conference, 2005..

[2]  M. M. Dacoregio,et al.  Performance assessment of a 2 kWp grid-connected, building-integrated, amorphous silicon photovoltaic installation in Brazil , 2000 .

[3]  Jordi Andreu,et al.  Large grid‐connected hybrid PV system integrated in a public building , 1998 .

[4]  R. J. Kaye A new approach to optimal sizing of components in stand-alone photovoltaic power systems , 1994, Proceedings of 1994 IEEE 1st World Conference on Photovoltaic Energy Conversion - WCPEC (A Joint Conference of PVSC, PVSEC and PSEC).

[5]  K. Bücher Site dependence of the energy collection of PV modules , 1997 .

[6]  Brian Norton,et al.  Optimal sizing of array and inverter for grid-connected photovoltaic systems , 2006 .

[7]  Ulrike Jahn,et al.  Operational performance of grid‐connected PV systems on buildings in Germany , 2004 .

[8]  Angele Reinders,et al.  Technical and economic analysis of grid-connected PV systems by means of simulation , 1999 .

[9]  U. Jahn,et al.  Performance of 170 grid connected PV plants in Northern Germany—Analysis of yields and optimization potentials , 1997 .

[10]  Mervyn Smyth,et al.  Performance analysis of a grid-connected building integrated photovoltaic system , 2003 .

[11]  S. Tripathy,et al.  Performance evaluation of 20 kWp photovoltaic system , 1993 .

[12]  Somchai Chokmaviroj,et al.  Performance of a 500kWP grid connected photovoltaic system at Mae Hong Son Province, Thailand , 2006 .

[13]  W. Palz,et al.  Photovoltaic system technology , 1992 .

[14]  Stefano Ubertini,et al.  Performance estimation and experimental measurements of a photovoltaic roof , 2003 .

[15]  E. W. Ter Horst,et al.  GRID-CONNECTED PV SYSTEMS -THE ROLE OF THE UTILITY SECTOR , 1994 .

[16]  B. Burger,et al.  Inverter sizing of grid-connected photovoltaic systems in the light of local solar resource distribution characteristics and temperature , 2006 .

[17]  M. J. Kearney,et al.  Performance of amorphous silicon double junction photovoltaic systems in different climatic zones , 2002, Conference Record of the Twenty-Ninth IEEE Photovoltaic Specialists Conference, 2002..

[18]  Kosuke Kurokawa,et al.  Measurements, analyses and evaluation of residential PV systems by Japanese monitoring program , 2003 .

[19]  G. Blaesser PV system measurements and monitoring the European experience , 1997 .

[20]  A. Iliceto,et al.  The largest PV installation in Europe: Perspectives of multimegawatt PV , 1998 .

[21]  Mariano Sidrach-de-Cardona,et al.  Performance analysis of a grid-connected photovoltaic system , 1999 .

[22]  E. E. van Dyk,et al.  Long-term monitoring of photovoltaic devices , 2002 .

[23]  Saffa Riffat,et al.  Monitoring results of two examples of building integrated PV (BIPV) systems in the UK , 2003 .

[24]  Sophia Antipolis,et al.  International energy agency task II database on photovoltaïc power systems: statistical and analytical evaluation of PV operational data , 1998 .