Competitive framework for procurement of interruptible load services

This paper deals with optimal procurement of interruptible load services within secondary reserve ancillary service markets in deregulated power systems. The proposed model is based on an optimal power flow framework and can aid the independent system operator (ISO) in real-time selection of interruptible load offers. The structure of the market is also proposed for implementation. Various issues associated with procurement of interruptible load such as advance notification, locational aspect of load, and power factor of the loads are explicitly considered. It is shown that interruptible load market can help the ISO maintain operating reserves during peak load periods. Econometric analysis reveals that a close relationship exits between the reserve level and amount of interruptible load service invoked. It was also found that at certain buses, market power exists with the loads, and that could lead to unwanted inefficiencies in the market. Investing in generation capacity at such buses can mitigate this. The CIGRE 32-bus system appropriately modified to include various customer characteristics is used for the study.

[1]  J. Doudna Overview of California ISO summer 2000 demand response programs , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).

[2]  Alberto Borghetti,et al.  Auctions with Explicit Demand-Side Bidding in Competitive Electricity Markets , 2002 .

[3]  G. Gross,et al.  Strategic bidding in electricity generation supply markets , 1999, IEEE Power Engineering Society. 1999 Winter Meeting (Cat. No.99CH36233).

[4]  Pravin Varaiya,et al.  Markets and pricing for interruptible electric power , 1993 .

[5]  H. Theil Introduction to econometrics , 1978 .

[6]  M. Bollen,et al.  Real time optimal interruptible tariff mechanism incorporating utility-customer interactions , 2000 .

[7]  Timothy D. Mount,et al.  A uniform price auction with locational price adjustments for competitive electricity markets , 1999 .

[8]  Chuin-Shan Chen,et al.  Interruptible load control for Taiwan Power Company , 1990 .

[9]  A. Papalexopoulos,et al.  Competitive procurement of ancillary services by an independent system operator , 1999 .

[10]  Gerald B. Sheblé,et al.  Direct load control-A profit-based load management using linear programming , 1998 .

[11]  Enrico Carpaneto,et al.  The role of load demand elasticity in congestion management and pricing , 2000, 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134).

[12]  F. Alvarado,et al.  Designing incentive compatible contracts for effective demand management , 2000 .

[13]  G. Strbac,et al.  Framework for the incorporation of demand-side in a competitive electricity market , 1996 .

[14]  F. Alvarado,et al.  The effect of demand elasticity on security prices for the PoolCo and multi-lateral contract models , 1997 .