A Case Study of Last Planner System Implementation in Nigeria

The work described in this paper presents preliminary results of an ongoing Research project. It focuses on the implementation of Lean Construction (LC) technique to improve construction management practice in Nigeria. To achieve this, design science research strategy was undertaken with different data collection methods. These methods included direct observations, interviews, questionnaires and documentary analysis. The research was carried out in a University construction site, where four prototype hostel buildings were being constructed simultaneously by four different contractors. LC technique via the Last Planner Systems (LPS) was adopted by one of the contractors in the construction of one of the hostel building. The results reveal that the LC project made significant improvements in terms of; the timely completion of the project, 30% cost savings as against the others and an average Percentage Plan Completed (PPC) of 80%. These improvements were facilitated by the way the site was planned, managed and controlled using LPS. Last Planner System (LPS) is the most developed LC tool used in improving work plans and control of projects. The paper concludes by discussing possible barriers hindering the full potential of LPS. These barriers include; lack of commitment to change and innovation, and starting off the implementation half way into start of the project. The critical success factors are also discussed and further research is being proposed.

[1]  Luis F. Alarcón,et al.  Improving Planning Reliability and Project Performance using the Reliable Commitment Model. , 2010 .

[2]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[3]  Herbert A. Simon,et al.  The Sciences of the Artificial , 1970 .

[4]  Ismail Abdul Rahman,et al.  Introduction to lean construction , 2011 .

[5]  Jan Holmström,et al.  Bridging Practice and Theory: A Design Science Approach , 2009, Decis. Sci..

[6]  Lauri Koskela Which kind of science is construction management , 2008 .

[7]  Gerhard Plenert What Is Lean , 2007 .

[8]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[9]  Algan Tezel,et al.  Design science research in lean construction : process and outcomes , 2012 .

[10]  Glenn Ballard,et al.  Production Control Principles , 2009 .

[11]  Alan R. Hevner,et al.  Design Science in Information Systems Research , 2004, MIS Q..

[12]  Salvatore T. March,et al.  Design and natural science research on information technology , 1995, Decis. Support Syst..

[13]  Luqman Oyekunle Oyewobi,et al.  Determinants of Unethical Performance in Nigerian Construction Industry , 2011 .

[14]  Elijah Olusegun Alabi Olumuyiwa Michael Ayodele,et al.  Abandonment of construction projects in Nigeria : causes and effects , 2011 .

[15]  M. M. Dlakwa,et al.  Reasons for overrun in public sector construction projects in Nigeria , 1990 .

[16]  H. Simon The Sciences of the Artificial, (Third edition) , 1997 .

[17]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[18]  Iris D. Tommelein,et al.  Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .

[19]  Samir Chatterjee,et al.  A Design Science Research Methodology for Information Systems Research , 2008 .

[20]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[21]  Lauri Koskela,et al.  Last planner system : experiences from pilot implementation in the middle east , 2009 .

[22]  Subashini Suresh,et al.  Critical Review of the Potential for the Implementation of Lean in the Nigerian Building Industry , 2012 .