Optimal scheduling for flexible job shop operation
暂无分享,去创建一个
[1] Arman R. Yaghubian,et al. Dry-or-buy decision support for dry kiln scheduling in furniture production , 2001 .
[2] Iiro Harjunkoski,et al. Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure , 2002, Eur. J. Oper. Res..
[3] Donald E. Brown,et al. Intelligent Scheduling Systems , 1995 .
[4] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[5] John A. Marin,et al. A Survey of Intelligent Scheduling Systems , 1995 .
[6] R. Sargent,et al. The optimal operation of mixed production facilities—a general formulation and some approaches for the solution , 1996 .
[7] J. Lenstra,et al. Job-Shop Scheduling by Implicit Enumeration , 1977 .
[8] Shi-Chung Chang,et al. Daily scheduling for R&D semiconductor fabrication , 1993, [1993] Proceedings IEEE International Conference on Robotics and Automation.
[9] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[10] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[11] Sheik Meeran,et al. Deterministic job-shop scheduling: Past, present and future , 1999, Eur. J. Oper. Res..
[12] Chao-Hsien Pan,et al. A study of integer programming formulations for scheduling problems , 1997, Int. J. Syst. Sci..
[13] Chinyao Low,et al. Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment , 2001 .
[14] Reha Uzsoy,et al. Benchmarks for shop scheduling problems , 1998, Eur. J. Oper. Res..
[15] Gintaras V. Reklaitis,et al. Overview of Scheduling and Planning of Batch Process Operations , 1996 .
[16] Peter B. Luh,et al. Scheduling of manufacturing systems using the Lagrangian relaxation technique , 1991, IEEE Trans. Autom. Control..
[17] A. Barbosa‐Póvoa,et al. An Improved RTN Continuous-Time Formulation for the Short-term Scheduling of Multipurpose Batch Plants , 2001 .
[18] Pius J. Egbelu,et al. SCHEDULING IN A PRODUCTION ENVIRONMENT WITH MULTIPLE PROCESS PLANS PER JOB , 1999 .
[19] Ignacio E. Grossmann,et al. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods , 2002 .
[20] Zhiwei Zhu,et al. Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach , 2000 .
[21] Tadeusz Sawik,et al. Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers , 2000 .
[22] Stephen J. Wilkinson. Aggregate formulations for large-scale process scheduling problems , 1996 .
[23] Shi-Chung Chang,et al. Scheduling flexible flow shops with no setup effects , 1994, IEEE Trans. Robotics Autom..
[24] Jeremy F. Shapiro,et al. Mathematical programming models and methods for production planning and scheduling , 1988 .
[25] Dion H. Cummings Mckoy. Production scheduling in a process and assembly job shop , 1999 .
[26] Ching-Jong Liao,et al. An Improved Formulation for the Job-Shop Scheduling Problem , 1992 .
[27] C. Pantelides,et al. Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 2. A Mathematical Decomposition Approach , 1996 .
[28] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .