An Integrated Simulation Platform for Railway Synthetic Monitor and Control System in Multiple Layer Transportation Hinge

In a multi-storey transport hub under ground, different platforms belong to different traffic line. To monitor and control the equipments situation, especially for the alarm equipments, information in multi-storey must be shared and linkage. This kind of information configuration comes down to the integrated management system in the whole city. In this paper, an information transferring model is presented, which share the information in different platform in the whole city traffic system. An integrated simulation platform is build which can be achieved in the present alarm by the multiple layer traffic hinge system.

[1]  Enrico Tronci,et al.  Integrating automatic verification of safety requirements in railway interlocking system design , 2001, Proceedings Sixth IEEE International Symposium on High Assurance Systems Engineering. Special Topic: Impact of Networking.

[2]  Karl Dittman Six steps to batch DCS system selection , 1990 .