Advanced Topics in Project Management Process

In this paper we present the evolution of project scheduling models with emphasis on temporal constraints.

[1]  Mark M. Klein,et al.  Scheduling project networks , 1967, CACM.

[2]  Erik Demeulemeester,et al.  New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .

[3]  Rolf H. Möhring,et al.  Scheduling project networks with resource constraints and time windows , 1988 .

[4]  Henry Wallace Clark,et al.  The Gantt Chart , 1947 .

[5]  Lucio Bianco,et al.  A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations , 2011, Comput. Oper. Res..

[6]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[7]  Armin Scholl,et al.  Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling , 1999, Eur. J. Oper. Res..

[8]  Tamás Kis RCPS with Variable Intensity Activities and Feeding Precedence Constraints , 2006 .

[9]  Lucio Bianco,et al.  A new formulation of the resource‐unconstrained project scheduling problem with generalized precedence relations to minimize the completion time , 2010, Networks.

[10]  Lucio Bianco,et al.  Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound , 2011, 4OR.

[11]  Tamás Kis,et al.  A branch-and-cut algorithm for scheduling of projects with variable-intensity activities , 2005, Math. Program..

[12]  Lucio Bianco,et al.  An Exact Algorithm to Minimize the Makespan in Project Scheduling with Scarce Resources and Feeding Precedence Relations , 2009, CTW.

[13]  Tamás Kis,et al.  A project-oriented decision support system for production planning in make-to-order manufacturing , 2004 .

[14]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[15]  L Bianco,et al.  A New Approach for the Project Scheduling Problem with Generalized Precedence Relationships , 2008 .

[16]  Erik Demeulemeester,et al.  A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem , 1997, Oper. Res..

[17]  S. Elmaghraby,et al.  The Analysis of Activity Networks Under Generalized Precedence Relations GPRs , 1992 .

[18]  James P. Lewis,et al.  Project Planning, Scheduling & Control: A Hands-On Guide to Bringing Projects in on Time and on Budget , 1991 .

[19]  Ravindra K. Ahuja,et al.  Network Flows , 2011 .

[20]  E. W. Davis,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[21]  Joanna Józefowska,et al.  Perspectives in modern project scheduling , 2006 .

[22]  Professor Dr. Klaus Neumann,et al.  Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.

[23]  Bert De Reyck,et al.  A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations , 1998, Eur. J. Oper. Res..

[24]  Ulrich Dorndorf,et al.  Project Scheduling with Time Windows , 2002 .