Development of an Experimental Waste Framework Based on Bim/Lean Concept in Construction Design

The construction industry faces many problems and challenges especially with the construction of housing which are due to the high level of non-value-adding activities (waste) that reduce the overall construction performance and productivity. In recent years, there have been investigations and research on improving the performance of construction. Lean construction is widely known as an effective process which aims to maximise customer value and the efficiency of the project by eliminating non-value-adding activities or waste. Moreover, the Building Information modelling (BIM) concept has been recognised as a collaborative process which aims to improve the overall project performance through its tools' capabilities. This paper intends to study the potential effects of integrating these two concepts in order to reduce construction waste. This paper presents a framework, named an Experimental Waste Framework based on the findings of this paper to explore how an integrated BIM and Lean concept can contribute to the practicable reduction of construction waste in the design process of construction.

[1]  George Jergeas,et al.  IT usage in Alberta's building construction projects : Current status and challenges , 2008 .

[2]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[3]  Algan Tezel,et al.  Design science research in lean construction : process and outcomes , 2012 .

[4]  R. Yin Case Study Research: Design and Methods , 1984 .

[5]  Salman Azhar,et al.  Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .

[6]  Mike Kagioglou,et al.  Technology adoption in the BIM implementation for lean architectural practice , 2011 .

[7]  Robert Owen,et al.  Implementing lean in construction: Lean construction and BIM-CIRIA Guide C725 , 2013 .

[8]  Chimay J. Anumba,et al.  Mobile ICT support for construction process improvement , 2006 .

[9]  Vijay K. Vaishnavi,et al.  Design Science Research Methods and Patterns: Innovating Information and Communication Technology , 2007 .

[10]  David E. Gray,et al.  Doing Research in the Real World , 2004 .

[11]  Russell Kenley,et al.  Quantifying levels of wasted time in construction with meta-analysis , 2005 .

[12]  Mike Kagioglou,et al.  BIM adoption and implementation for architectural practices , 2011 .

[13]  Alan R. Hevner,et al.  Design Research in Information Systems: Theory and Practice , 2010 .

[14]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[15]  Alan R. Hevner,et al.  Design Science in Information Systems Research , 2004, MIS Q..

[16]  Bhargav Dave,et al.  Challenges and opportunities in implementing lean and BIM on an infrastructure project , 2013 .

[17]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .