Optimal size of kanban board in a single stage multi product system

The aim of this paper is to define a methodology for determining the optimal size of the supermarket (between two workstations) through the optimization of the number of kanban in a kanban board. It also identifies some production parameters that greatly influence the optimal size of a kanban board. The approach chosen is the building of a simulation model of a single stage multi-product system with Arena, while OptQuest has been used for the next optimization phase.

[1]  Randall P. Sadowski,et al.  Simulation with Arena , 1998 .

[2]  A. J. Yuste,et al.  A dynamic-balanced scheduler for genetic algorithms for grid computing , 2009 .

[3]  Jeffrey W. Herrmann,et al.  A kanban module for simulating pull production in Arena , 2005, Proceedings of the Winter Simulation Conference, 2005..

[4]  O. V. Krishnaiah Chetty,et al.  A genetic algorithmic approach to multi-objective scheduling in a Kanban-controlled flowshop with intermediate buffer and transport constraints , 2006 .

[5]  Georg N. Krieg,et al.  Performance evaluation of two-stage multi-product kanban systems , 2008 .

[6]  Liberatina Carmela Santillo,et al.  Transformation of a production/assembly washing machine lines into a lean manufacturing system , 2009 .

[7]  Georg N. Krieg Kanban-Controlled Manufacturing Systems , 2005 .

[8]  Georg N. Krieg,et al.  A decomposition method for multi-product kanban systems with setup times and lost sales , 2002 .

[9]  W. E. Wilhelm,et al.  Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system , 1998, Eur. J. Oper. Res..

[10]  Ronald G. Askin,et al.  Defining inventory control points in multiproduct stochastic pull systems , 2009 .

[11]  Koustubh Sharma,et al.  BUFFER STOCKS IN KANBAN CONTROLLED (TRADITIONAL) UNSATURATED MULTI-STAGE PRODUCTION SYSTEM , 2008 .

[12]  Yves Dallery,et al.  A performance comparison of pull type control mechanisms for multi-stage manufacturing , 2000 .

[13]  A. J. Yuste,et al.  Genetic Fuzzy Rule-Based meta-scheduler for Grid computing , 2010, 2010 4th International Workshop on Genetic and Evolutionary Fuzzy Systems (GEFS).

[14]  C. Sendil Kumar,et al.  Literature review of JIT-KANBAN system , 2007 .

[15]  Adnan M. Mukattash,et al.  Design and analysis of production control scheme for Kanban-based JIT environment , 2006, J. Frankl. Inst..

[16]  Donald R. Smith,et al.  Understanding the fundamentals of Kanban and CONWIP pull systems using simulation , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).